- NEWS UPDATE 06.2026 - [HOT] How To Discount - How To Pay By Visa Through Paypal - [HOT] Remote Service Support Program - How to Payment and Delivery - Exchange Manual & Software -

Furukawa Crawler Drill HCR1200-DSIII Operation Maintenance Manual HCR1200-DSIII-F103E

Expert Support

Full Speed

100% Working

Furukawa Crawler Drill HCR1200-DSIII Operation Maintenance Manual HCR1200-DSIII-F103E

Size: 9.65 MB
Format: PDF
Language: English
Brand: Furukawa
Type of Machine: Crawler Drill
Type of Manual: Operation Maintenance Manual
Model: Furukawa HCR1200-DSIII Crawler Drill
Applicable From Serial No.2613010-
Part Number: HCR1200-DSIII-F103E
Number of Pages: 274 Pages

10 USD

  • Description

Description

Contents:

  1. Safety Precautions
    1.1 Safety Management​
    1.2 Avoid Hazards Before Engine Start​
    1.3 Avoid Hazards After Engine Start​
    1.4 Avoid Hazards, Operate Safely​
    1.5 Avoid Hazards When Parking​
    1.6 Avoid Hazards When Towing​
    1.7 Avoid Hazards When Transporting​
    1.8 Safety Precautions Before Maintenance​
    1.9 Safety Precautions During Maintenance​
    1.10 Safety Precautions After Maintenance​
    1.11 Avoid Hazards When Handling the Batteries​
  2. Specifications
    2.1 Component Names​
    2.2 Specifications​
  3. Operator’s Station
    3.1 Switch Panel​
    3.2 Meter Panel​
    3.3 Travel Levers​
    3.4 Hydraulic Cylinder Control​
    3.4.1 Hydraulic Cylinder Control Levers​
    3.4.2 Rod Changer Control Levers​
    3.5 Drilling Control Box​
    3.5.1 DrillingConPanel​
    3.5.2 Drilling Switch Panel​
    3.6 Pressure Gauges​
    3.7 Operator’s Cab​
    3.8 Handling of Air-Conditioner​
    3.9 Handling of Fire Extinguisher​
  4. Running Operation
    4.1 Daily Inspection​
    4.1.1 Before Starting the Engine​
    4.2 Operation of Engine​
    4.2.1 Before Starting the Engine​
    4.2.2 Starting the Engine​
    4.2.3 After Starting the Engine​
    4.2.4 Stopping the Engine​
    4.3 Traveling the Machine​
    4.3.1 Traveling Posture​
    4.3.2 Starting​
    4.3.3 Direction Control​
    4.3.4 Stopping the Machine​
    4.4 Parking the Machine​
    4.4.1 Locking​
    4.5 Drilling Work​
    4.5.1 Preparation for Drilling​
    4.5.2 Collaring​
    4.5.3 Regular Drilling​
    4.5.4 End of Drilling Work​
    4.6 Rod Changer Operation​
    4.6.1 Loading of Rods​
    4.6.2 Adding of Rod​
    4.6.3 Drawing of Rods​
    4.7 Auto Greaser​
  5. Transporting
    5.1 Loading Machine on a Trailer​
    5.2 Towing​
    5.3 Lifting Procedure​
  6. Electrical Equipment
    6.1 Control Panel​
    6.1.1 Fuses​
    6.1.2 Energy Saving Mode​
    6.2 Battery Servicing​
    6.2.1 Replace Batteries​
    6.2.2 Using Booster Batteries​
  7. Operation in Cold Weather
  8. Storage
  9. Troubleshooting
  10. General Safety Instructions
  11. Fuels and Lubricants
    11.1 Emergency Measures​
    11.2 Fuel​
    11.3 Lubricants​
    11.4 Oil Supply Pump​
  12. Coolant
  13. Refill Capacities
  14. Maintenance Interval Schedule
    14.1 When Required​
    14.2 First Maintenance​
    14.3 Periodic Maintenance / 50 Hours​
    14.4 Periodic Maintenance / 250 Hours​
    14.5 Periodic Maintenance / 500 Hours​
    14.6 Periodic Maintenance / 1000 Hours​
    14.7 Periodic Maintenance / 2000 Hours​
    14.8 Periodic Maintenance / 3000 Hours​
  15. Periodic Replacement of Maintenance Parts