Expert Support
Full Speed
100% Working
Grove Crane RT528C 71619 Parts Manual 2016
20 USD
- Description
Description
Contents:
Boom Assembly – 3 Section 28′-70′
Cylinder Assembly – 6.50” Telescope
Support Assembly – Telescope Cylinder
Ball Assembly – 150# Headache
Hook Block Assembly
Sheave Wheel Assembly (Not Available As Assembly )
Tie Down Installation – Hook Block
Boom Extension Installation – 25′
Sheave Assembly
Mast Assembly
Extension Assembly – 25′ Fixed Boom
Alignment Device Installation
Carrier Installation – Boom Extension
Roller Assembly
Support Assembly – Roller
Sheave Installation – Boom Nose
Sheave Assembly – Complete
Boom Elevation Indicator Installation
Angle Indicator Assembly
Panel And Cable Reel Installation
Panel Assembly – A2b Control
Harness Assy, Outrigger Cab To Board
Electric Reel Assembly – Anti 2 Block
Receptacle Assembly – 6 Pin
Plug Assembly – 6 Pin
Switch And Roller Guides Installation – Main Boom
Switch Assy, Anti-Two Block
Anti-Two Block Weight W/Chain
Guide Assembly – Roller
Anti-Two Block Installation – Swing Away
Cord Assembly – Extension
Shaft Installation – Boom Pivot And Upper Lift
Hydraulic Lines Installation – Telescope
Hydraulic Lines Installation – Telescope Control
Hydraulic Lines Installation – Lift
Valve Installation – Control
Valve Assembly – 4 Section
Valve Assembly – 2 Section Control
Valve Assembly – Pressure Reducing/Relieving
Valve Assembly – Transmission Shift Control
Trans Shift Bracket
Valve Assembly – Solenoid
Valve Assembly – 3 Station Solenoid
Hydraulic Lines Installation – Test Panel
Main Hoist Installation – Ho15d-16
Hoist Assembly – Low Profile
Hoist Assembly – Ho15d-16g
Valve Assembly – Motor Control
Brake Assembly
Gear Reduction Assembly
Motor Assembly – Hoist Control
Cable Follower And Idler Drum Installation
Tubing Installation – Hoist
Rotation Indicator Installation
Sensor Assembly – Rotation Indicator
Idler And Follower Installation
Idler And Follower Assembly
Hydraulic Schematic – Main And Auxiliary Hoist
Hydraulic Lines Installation – Main Hoist Control
Turntable Drive Installation
Box Assembly – Swing
Swing Box And Brake Assembly
Brake Assembly – Swing
Motor Assembly – Orbit
Counterweight Installation
Cylinder Installation – Lift
Cylinder Assembly – Lift
Valve Installation – Flow Divider
Valve Assembly – Flow Divider
Bearing Bolt Installation
Lock Pin Installation
Lock Installation – Swing
Cable Assy, Swing Lock
Swivel Installation – Electric, Air And Hydraulic
Swivel Assembly – Hydraulic
Swivel Assembly – 12 Port Air/Hydraulic
Ring Assembly – Slip
Cooler Installation – Oil
Fan Assembly
Guard Installation – Pinion
Hydraulic Lines Installation – Swing
Hydraulic Lines Installation – Swing Control
Warning Device Installation
Hydraulic Lines Installation – Supply, Pressure And Return
Valve Assembly – Residual Check
Cab Installation
Window Assembly
Valve Assembly – Dual Brake
Pedal And Valve Assembly – Accelerator
Valve Assembly – Control
Column Assembly – Steering
Steering Wheel Assembly
Valve Assembly – Steering
Bracket Assembly
Extinguisher Installation – Fire
Air Lines Installation – Cab
Console Installation – Front
Control Assembly – Shift
Valve Assembly – Directional Control
Harness Installation – Console
Air Lines Installation – Front Console
Hydraulic Lines Installation -Front Console
Control Handles Installation
Rotation Indicator Assembly
Pedal Installation – Swing Brake
Cab Heater Installation – Propane
Heater Assembly – Propane
Heater Assembly – Propane Circuit Board Assy
Heater Assembly – Propane Fuel And Ignition Systems
Heater Assembly – Propane Remote Control Parts
Heater Assembly – Propane Control Panel Parts
Heater Assembly – Propane Motor And Blower Parts
Heater Assembly – Propane Case And Exchanger Parts
Heater Assembly – Propane Regulator And Exhaust Parts
Mounting Kit Installation – Propane Tank
Kit, Tank Mounting
Cover Plate Installation
Switch Installation – Rear Axle Lockout Override
Control Seat Installation
Fan Installation – Cab Circulating
Fan Assembly – 12 Volt Cab (Complete Assembly )
Seat Belt Installation
Mat Installation – Floor
Mirror Installation – Cab
Astray Installation – Ash
Acoustical Installation
Wiper Installation – Skylight
Windshield Washer Installation
Rear Cover Installation – Cab
Gauge Installation – Water Temperature
Work Light Installation
Electrical System Installation
Harness Assembly – Superstructure
Electrical System Installation – Cab
Harness Assembly – Cab Rear
Hydraulic Lines Installation – Steer Control
Engine Installation – Cummins 6bt5.9
Filter Assembly – Oil
Pump Assembly – Steer
Cylinder Assembly – Throttle
Belt & Filter Cummins 6bt5.9
Muffler Installation (Not Available As Assembly )
Cleaner Installation – Air (Not Available As Assembly )
Cleaner Assembly – Air
Torque Converter Installation
Torque Converter Assembly
Harness Installation – Engine
Harness Assembly – Cummins 6bt5.9 Engine
Pump Installation (Not Available As Assembly )
Pump Assembly – 3 Stage Tandem
Hydraulic Lines Installation – Engine
Battery Installation
Electrical System Installation – Carrier
Harness Assy, Outrigger Cab To Board Carrier Frame
Radiator Installation
Transmission Installation
Transmission Assembly
Valve Assembly Transmission
Driveline Installation
Driveline Assembly
Hydraulic Lines Installation – Transmission Shift
Hydraulic Lines Converter And Transmission
Frame Section
Axle Installation – Front
Axle Assembly
Axle Assembly Differential Carrier Parts
Axle Assembly Housing Parts
Axle Assembly Wheel End Parts
Axle Assembly Brake Parts
Axle Assembly Wheel Cylinder Assembly
Cylinder Assembly – Steer
Axle Installation – Rear
Cylinder Assembly – 5″ Lockout
Axle Assembly Differential Carrier Assembly
Axle Assembly Housing Assembly
Axle Assembly Hub And Shaft Group
Axle Assembly Brake Assembly
Lug Nut And Washer Installation
Rear Steer Indicator Installation
Parking Brake Installation
Brake Chamber Assembly
Tire And Wheel Assembly
Valve Installation – Rear Axle Lockout
Valve Assembly – Lockout
Cylinder Assembly – Air Lockout
Hydraulic Lines Installation – Front Steer
Hydraulic Lines Installation -Rear Axle L/O
Hydraulic Schematic – Rear Steer
Hydraulic Lines Installation – Rear Steer
Hydraulic Brake Lines Installation
Outrigger Beam Installation
Cylinder Assembly – 4 1/2″ Outrigger Jack
Cylinder Assembly – Extension Outrigger
Outrigger Valve Installation
Valve Assembly – Integrated Outrigger
Valve Assembly – 4 Stack Outrigger Solenoid
Valve Assembly – Check
Stowage Installation – Outrigger Float
Float Assembly – Outrigger
Hydraulic Lines Installation – Outrigger
Hood Installation – Engine
Door Assembly – Left Hand
Door Assembly – Right Hand
Exterior Lights Installation
Mirror Installation – Frame
Battery Box Installation
Fender Installation
Hydraulic Reservoir Installation
Fuel Tank Installation
Tool Box And Decking Installation
Alarm Installation – Back-Up
Cover Installation – Pump
Air Lines And Tank Installation
Air Schematic
Air Tank And Valve Installation
Actuator Assembly – Air Hydraulic
Pintle Hook Installation
Pintle Hook
Decal Installation – Rt500c Series
Decal Installation W/Boom Angle Indicator













