Expert Support
Full Speed
100% Working
Grove Crane RT530E-2 226890 Parts Manual 2017
30 USD
- Description
Description
Contents:
Boom Assembly – 4 Section
Cylinder Assembly – Telescope (Complete Assembly)
Valve Assembly – Counterbalance
Shaft Installation – Upper & Boom Pivot
Alarm Installation – Lmi
Cable Assembly – Lmi Alarm (Complete Assembly)
Kit Installation – Iflex 5 Lmi Boom
Cable Reel Lwg508 – Iflex 5
Roller Guide Assembly
Box Assembly – Junction
Flag Assembly – A2b Retainer
Connector Assembly Dummy Plug, 2-Pin
Weight And Chain Assembly (Complete Assembly)
Kit Installation – Iflex 5 Lmi Boom (For Reference Only)
Ball Assembly – Overhaul (7.5 Ton)
Hook Block Assembly – 33 Ton (30 Mt) (Complete Assembly)
Socket Assy 5/8″
Indicator Installation – Boom Angle
Pointer Assembly
Cover Installation – Boom Hole
Sheave Installation – 2 Over 3
Sheave Assembly – 5/8″ Rope
Drive Installation – Turntable And (Rotek)
Turntable Section
Motor Assembly – Swing Drive (Complete Assembly)
Swivel Installation – Electric, Water And Hydraulic
Swivel Assembly – Electric, Water And Hydraulic
Swivel Assembly – 14 Port Hydraulic, Water And Air Conditioning
Ring Assembly – Slip 15 Conductor
Valve Installation – Control Main And Future Auxiliary Hoist
Valve Assembly – Directional Control 4 Section
Valve Assy. Inlet Section
Valve Assembly – Accessory With Swing And Steer Directional Control
Accumulator Assembly – Hydraulic Oil
Hydraulic Lines Installation – Main And Future Auxiliary Hoist
Hoist Installation – Main (C.E. Conformity)
Hoist Assembly – Hp15c/17g With 3rd Wrap
Bolt Installation – Bearing
Cylinder Installation – Lift
Cylinder Assembly – 9″ Lift (Complete Assembly)
Valve Assembly – Holding (Complete Assembly)
Binder Installation
Kit – Lmi S/S Iflex 5
Hydraulic Lines Installation – Cab
Kit Installation – Iflex 5 Lmi Superstructure
Pin Installation – Turntable Lock
Cover Installation – Valve
Mirror Installation – Turntable
Lube Installation – Turntable Bearing Manual
Counterweight Installation
Cover Installation – Hoist Main
Mirror Installation – Hoist
Foam Installation -Valve Cover
Cooler Installation – Hydraulic Oil
Cooler Assembly – Hydraulic Oil (Complete Assembly)
Cab Installation (C.E. Conformity)
Cab Assembly (C.E. Conformity)
Cab
Door Installation – Cab (Not Available As Assembly)
Kit – Skylight Wiper (Complete Assembly)
Kit – Front Wiper (Complete Assembly)
Window Assembly – Rear (Complete Assembly)
Window Assembly – Right Hand (Complete Assembly)
Fan Assembly – 12 Volt Cab (Complete Assembly)
Seat Installation – Control Without Auxiliary Hoist Control
Seat Assembly – Control Without Auxiliary Hoist Control
Switch Assembly – Proximity (Normally Open)
Controller Assembly – 8-32 Volt Left Hand Armrest
Controller Assembly – 8-32 Volt Right Hand Armrest
Handle Assy. W/Thumper
Harness Assembly – Seat (Complete Assembly)
Acoustics Installation
Console Installation – Front Rt540e3
Console Assembly – Front Rt540e
Harness Assembly – Front Console (Complete Assembly)
Gauge, 12 Volt Tachometer (With Hourmeter)
Electrical System Installation – Superstructure Cab
Panel Assembly – Fuse And Relay (Superstructure Cab)
Harness Assembly – Fuse And Relay Panel (Superstructure Cab)
Heater/Cooler Installation – Cab
Kit – Cab Heater And Air Conditioner (Complete Assembly)
Screen Installation – Sun
Kit – Lmi Iflex 5 Cab (Complete Assembly)
Centeral Unit – Iflex 5
Console Assembly – Iflex 5 Graphic (Complete Assembly)
Electrical System Installation – Superstructure
Harness Assembly – Superstructure Tier 3
Lmi Cab Installation – Iflex5
Cover Installation – Rear Cab
Switch And Lamp Installation – Cross Axle
Pedals Installation – Without Auxiliary Hoist
Valve Assembly – Brake Treadle (Complete Assembly)
Controls Installation – Steer And Drive
Valve Assembly – Steering Control (Complete Assembly)
Column Assembly – Modified Tilt Steering (Complete Assembly)
Column Assembly – Tilt Steering (Complete Assembly)
Harness Assembly – Turn Signal/Washer (Complete Assembly)
Harness Assembly – Shifter (Complete Assembly)
Indicator Installation – 3rd Wrap
Indicator Installation – Low Steer Pressure
Frame – Carrier (For Reference Only)
Frame – Carrier
Beam Install – Outrigger (Not Available As Assembly)
Beam Assembly – Outrigger (Complete Assembly)
Cylinder Assembly – 4″ Outrigger Jack (Complete Assembly)
Cylinder Assembly – Outrigger Extension (Complete Assembly)
Cylinder Assembly – 2 1/2″ O/R Extension (Complete Assembly)
Fender & Decking Installation
Hood Installation – Engine
Counterweight Installation -Ce
Float Installation – Outrigger
Float Assembly – Outrigger (Complete Assembly)
Lights Installation – Exterior (C.E. Conformity)
Head/Turn Signal Signal Light Assembly – Left Hand
Head/Turn Signal Signal Light Assembly – Right Hand
Harness Assembly – Front Lights C. E. Conformity
Harness Assembly – Marker Light C. E. Conformity
Harness Assembly – Rear Lights C. E. Conformity
Tie Down Installation – Hook Block
Cover Installation -Battery Box
Mirror Installation – Rear View
Step Installation
Hardware Kit – Decal
Cover Installation – Outrigger Beam
Electrical System Installation – Carrier
Harness Assembly – Carrier (Complete Assembly)
Panel Assembly – Engine Relays (Complete Assembly)
Harness Assembly – Engine Relay Panel (Complete Assembly)
Tank Installation – Hydraulic
Reservoir Assembly – Hydraulic (Complete Assembly)
Filter Assy. Hyd. Return
Ladder Assembly (Complete Assembly)
Valve Installation – Hydraulic Carrier With Differential Lock
Valve Assembly – Outrigger Control 4 Section
Valve Assembly – Park Brake Range Shift (Complete Assembly)
Valve Assembly – Outrigger Selector Rear Steer
Valve Assembly – Differential Lockout (Complete Assembly)
Valve Assembly – Differential Lockout C. E. Conformity
Cover Installation – Outrigger Box
Hydraulic Lines Installation – Carrier
Tray Installation – Storage
Axle Installation – Rear With Differential Lock
Axle Assembly – Drive/Steer With Differential Lock
Diff. Carrier Group
Housing & Hub Group
Planetary Hub Group
Steer Cylinder Group
Brake Group
Harness Assembly – Axle Differential Supplemental
Cylinder Assembly – 5″ Lockout (Complete Assembly)
Axle Installation – Front With Differential Lock
Tire And Wheel Installation – General 16.00 X 25
Tire And Wheel Assembly – General 16.00 X 25
Wheel Assembly – 11.25″ X 25″ (Complete Assembly)
Driveline Installation
Driveline Assembly With Center Bearing
Driveline Assembly (Complete Assembly)
Engine Installation – Cummins Qsb6.7 Domestic
Engine Assembly – Cummins Qsb6.7 Domestic
Transmission Assembly – 3 Speed (Complete Assembly)
Converter Housing Group
Case & Rear Cover Group
Turbine Shaft Group
Drive Plate Group
Torque Converter Group
Gear Group
Auxiliary Pump Drive Group
Pump Drive Group
Forward Shaft Group
Reverse & 2nd. Shaft Group
Reverse Idler Group
Low Speed Shaft Group
3rd. Shaft Group
Idler Shaft Group
Output Shaft Group
Hi/Low Range Shift Cont. Group
Disc Brake Group
Charge Pump & Filter Group
Control Valve Mounting Group
Control Valve Assy. Group
Brake Assembly – Parking (Complete Assembly)
Pump Assembly – Gear (Complete Assembly)
Pump Assembly – Piston (Complete Assembly)
Electrical System Installation – Engine
Harness Assembly – Engine (Complete Assembly)
Kit – Cable (Engine) (Complete Assembly)
Radiator Installation
Radiator Assembly (Not Available As Assembly)
Cooler Assembly – Radiator/Charge Air (Complete Assembly)
Tank Assembly – Surge (Not Available As Assembly)
Tank Installation – Fuel
Tank Assembly – 58 Gallon Fuel (Complete Assembly)
Mounting Kit – Oil Cooler
Battery Installation
Kit – Cable (Batteries) Rt535
System Installation – Exhaust
Cleaner Installation – Air
Cleaner Assembly – Air (Complete Assembly)
Grill Installation – Engine Hood (C.E. Conformity)
Foam Installation -Engine Hood
16mm Dia Hoisting Wire Rope –
Miscellaneous Decals
Decal Installation – Rt535/540e (Foreign Standard)
Decal Installation Rt530ce-2 (Nomenclature)
Decal Installation – Rt530e2 (Italian)













