Expert Support
Full Speed
100% Working
Grove Crane RT530E-2 280276 Parts Manual 2016
20 USD
- Description
Description
Contents:
Boom Assembly Complete (95′)
Boom Assembly 95′
Cylinder Assembly – Telescope (Complete Assembly)
Valve Assembly – Counterbalance
Boom & Upper Pivot Shaft Install
Indicator Installation – Boom Angle
Pointer Assembly
Sheave Installation – 2 Over 3
Sheave Assembly – 5/8″ Rope
Light Installation – Boom
Boom Light-Rework
Cable Assembly – Boom Lights (Complete Assembly)
Kit Installation – Iflex 5 Lmi Boom
Cable Reel Lwg508 – Iflex 5
Roller Guide Assembly
Box Assembly – Junction
Flag Assembly – A2b Retainer
Connector Assembly Dummy Plug, 2-Pin
Kit-Lmi Auxiliary Boom Nose
Extension Kit Installation – Boom
Junction Box Assembly – 80mm X 75mm, Pg9 + 2-Pin
Lmi Boom Install Kit – Iflex 5
Tele-Off Boom Extension Kit
Hook Block Assembly – 33 Ton (30 Mt) (Complete Assembly)
Lmi Aux Boom Nose Kit Install
Ball Assembly – Overhaul (7.5 Ton)
Nose Installation – Auxiliary
Boom Extension Installation -26-45′
Boom Extension Assembly -26-45′
Mast Assembly
Bottle Jack Assy (Modified)
Cylinder Assembly – Bottle Jack
Carrier Installation – Jib Extension
Boom Mount Installation
T/T Weld & Drive Install
Motor Assembly – Swing Drive (Complete Assembly)
Lock Installation – 360 Swing
Lock Assembly – Swing (Complete Assembly)
Counterweight Installation
Electric, Water & Hydraulic Swivel Installation
Electric, Water & Hydraulic Swivel Assembly
Swivel Assy-14 Port Hyd Assy.
Control Valve Installation
Directional Control Val(4sect)
Valve Assy. Inlet Section
Accessory Manifold
T/T Pin Lock Control Installation
Hydraulic Lines Installation Main & Auxiliary Hoist
Hoist Installation – Main And Auxiliary
Hoist Assembly – Hp15c/17g With 3rd Wrap
Roller Assy. Idler Group
Bolt Installation – Bearing
Hoist Mirror Installation
Cylinder Installation – Lift
Lift Cylinder Assembly
Valve – Lift Cyl Pilot Hold
Kit – Lmi S/S Iflex 5
Hydraulic Lines Installation -Cab
Binder Installation
Kit Installation – Iflex 5 Lmi Superstructure
Heater & Air Condition Installation (Superstructure)
Air Cond Lines Kit – S/S
A/C Condenser-Vert. Mtg. 24v.
Valve Cover Comps Installation
Valve Cover Installation
Esi-Superstructure
Harness Assembly -Ss
Diode (Modified)
360 Swing Lock Pedal Install
Pedal Assembly – Foot (Complete Assembly)
Turntable Bearing Lube Installation
Light Installation – Strobe
Light Assembly – Modified Strobe (Complete Assembly)
Washer Bottle Installation
Non-Skid Tape Installation
Cab Assy 24v
Cab Sub- Assembly (Sg-24v)
Glass Door Assembly
Sliding Skylight
Sliding Glass Sub/Assy.
Window Assy. Rh Side
Glass Assy. Sliding
Glass Assy. Fixed
Window Assy-Rear
Kit – Skylight Wiper (24 Volt)
Kit – Front Wiper (24 Volt)
Heater & A/C Installation – Superstructure Cab
24v Heater/Cool Kit
Acoustics Installation (Sg)
Cab Misc Components
Cab Brackets Installation
Pedal Group Installation
Swing Brake Pedal-5v
Pedal, Throttle 5v
Valve Assembly – Brake Treadle (Complete Assembly)
Cab Crane Star Installation
Ctrl Seat Install D.A. W/Aux
Control Seat Assembly -Dual Axis With Auxiliary Hoist
Switch Assembly – Proximity (Normally Open)
Controller Assembly – 8-32 Volt Right Hand Armrest
Controller Assembly – 8-32 Volt Left Hand Armrest
Harness Assembly -Seat
Seat
Heater & Air Condition Control Panel Installation
Heat/Ac Control 12v/24v Grove
Plastic Covers Installation
Pedal Installation – Boom Telescope
Pedal Assembly – Electronic Telescope (Complete Assembly)
Drive Controls Installation
Steering Column W/ Cluster
Valve Assembly – Steering Control (Complete Assembly)
Boom Light Switch
Lmi Internal Light Bar Installation
Rcl Cab Kit Install, Iflex2
Rcl Cab Kit, Iflex2, Expert
Handle Installation Hoist Access
Esi-Cab
Fuse & Relay Panel Assembly
Fuse & Relay Harness Assy
Overhead Console Assembly
Harness Assembly -Overhead Cab Panel
Panel Assy-Front Console
Harness Assembly -Front Panel Cab
Harness Assembly -Superstructure Cab
Receptacle Harness
Rear Cab Cover Installation
3rd Wrap Indicator Installation
Fire Extinguisher Installation
Fire Extinguisher Assembly
Rework-Brake Pedal
Roller Assembly
Cab Installation -Components
Heater Lines Installation -Cab
Tcu And Sat Antenna Kit
Carrier Frame Complete
Frame Assembly
Outrigger Beam Installation
O/R Beam Assembly
Jack Cylinder 4.00 Br
O/R Ext Cyl-Complete Assy
Fender & Decking Install
Engine Hood Installation
O/R Float Installation
Outrigger Float Assembly
Exterior Lights Installation -Dom 24v
Tie Down Installation – Hook Block
Battery Box Cover Installation
Mirror Installation – Rear View
Outrigger Controller Installation
Outrigger Controller Assembly
Cable Assembly
Hardware Kit – Decal
Esi-Carrier
Wiring Harness-Carrier
Hydraulic Tank Installation
Hyd Reservior Assembly
Hydraulic Valve Installation
Valve Assembly – Outrigger Control 4 Section
Park Brake Range Shift Valve
Valve-Axle Lockout
O/R Rear Steer Valve
Hydraulic Lines Installation
Solenoid Valve Assembly
Storage Tray With Mat Installation
Rear Axle Installation W/O Differential Lock
Drive Steer Axle
Diff. Carrier Group
Axle Housing Group
Hub & Shaft Group
Brake Group
Brake Assembly ,Group
Cyl Assembly -2.50 Steer Br
Cylinder – Lockout Br
Front Axle Installation Without Differential Lock
Driveline Installation
Driveline Assembly With Center Bearing
Driveline Assembly (Complete Assembly)
Engine Installation -Brazil
Engine Assembly -Brazil
Transmission
Converter Housing Group
Case & Rear Cover Group
Turbine Shaft Group
Drive Plate Group
Torque Converter Group
Gear Group
Auxiliary Pump Drive Group
Pump Drive Group
Forward Shaft Group
Reverse & 2nd. Shaft Group
Reverse Idler Group
Low Speed Shaft Group
3rd. Shaft Group
Idler Shaft Group
Output Shaft Group
Hi/Low Range Shift Cont. Group
Disc Brake Group
Charging Pump Group
Control Valve Mounting Group 24 Volt
Control Valve Assy.Group 24v.
Pump Assembly – Gear (Complete Assembly)
Pump Assembly – Piston (Complete Assembly)
Pump Ass’y With Flow Divider
Esi-Engine
Wiring Harness-Engine T3
Brake-Park Assy W/O Spacer
Filter Assembly (Complete Assembly)
Radiator Installation -Brazil
Radiator Assembly -Brazil
Fuel Tank Installation T3
Fuel Tank Assy. 220l Complete
Battery Box Installation
Battery Box Assembly
Fuse Panel Assembly
Harness Assembly -Engine Relay Panel
Battery Cable Kit
Exhaust System Installation
Air Cleaner Installation -Brz
Air Cleaner Assembly
Hydraulic Oil Cooler Install
Hydraulic Oil Cooler
Air Condition Installation -Carrier
Compressor(Freon)-24v Pad, Kit
A/C Hose Kit-Carrier
Engine Hood Grill Installation
Block Heater Installation -Qsb 120v
Step Installation -Hoist Access
Oil Cooler Installation
Oil Cooler-Transmission
Socket Assembly – 5/8″ Wedge
Decal Installation -French
Decal Installation -Rt530e-2 Nomenclature
Decal Installation -Spanish













