Expert Support
Full Speed
100% Working
Grove Crane RT530E-2 605951 Parts Manual 2016
20 USD
- Description
Description
Contents:
Boom Assembly Complete (95′)
Boom Assembly 95′
Cylinder Assembly – Telescope (Complete Assembly)
Valve Assembly – Counterbalance
Boom & Upper Pivot Shaft Install
Indicator Installation – Boom Angle
Pointer Assembly
Sheave Installation – 2 Over 3
Sheave Assembly – 5/8″ Rope
Light Installation – Boom
Boom Light-Rework
Cable Assembly – Boom Lights (Complete Assembly)
Alarm Installation -Lmi
Cable Assembly – Lmi Alarm (Complete Assembly)
Kit Installation – Iflex 5 Lmi Boom
Cable Reel Lwg508 – Iflex 5
Roller Guide Assembly
Box Assembly – Junction
Flag Assembly – A2b Retainer
Connector Assembly Dummy Plug, 2-Pin
Lmi Boom Install Kit – Iflex 5
Overhaul Ball 7 T (7.5 Ton)
Kit – Lmi S/S Iflex 5
Hook Block Assembly
Cover Installation – Boom Hole
Boom Mount Installation
Ce Cwt Install – Italy
Electric, Water & Hydraulic Swivel Installation
Electric, Water & Hydraulic Swivel Assembly
Swivel Assy-14 Port Hyd Assy.
Control Valve Installation -Ce
Directional Control Val(4sect)
Valve Assy. Inlet Section
Accessory Manifold
Accumulator Assembly – Hydraulic Oil
T/T Pin Lock Control Installation
Hydraulic Lines Installation Main & Future Auxiliary Hoist
Hoist Installation – Main (C.E. Conformity)
Hoist Assembly – Hp15c/17g With 3rd Wrap
Roller Assy. Idler Group
Bolt Installation – Bearing
Cylinder Installation – Lift
Lift Cylinder Assembly
Valve – Lift Cyl Pilot Hold
Hydraulic Lines Installation -Cab
Binder Installation
Kit Installation – Iflex 5 Lmi Superstructure
Valve Cover Comps Installation
Valve Cover Install-Ce
Esi-Superstructure
Harness Assembly -Ss
Diode (Modified)
Valve Foam Cover Installation
Mirror Installation – Turntable
Turntable Bearing Lube Installation
Counterweight Installation
Hoist Cover Installation – Main (C.E. Conformity)
Foam Kit-Hoist (M)
Mirror Installation – Hoist (Ce With Main Hoist Only)
Light Installation – Strobe
Light Assembly – Modified Strobe (Complete Assembly)
Cover Installation – Bottom
Foam Cover Installation -Bottom
Counterweight Foam Install
Counterweight Foam Kit
Washer Bottle Installation
Crane Star Installation -Superstructure (C.E. Conformity)
Tcu And Sat Antenna Kit
Non-Skid Tape Installation
Cab Assy Ce 24v (Purchased)
Cab Sub-Assy (Ce)
Glass Door Assembly
Window Assy. Rh Side
Glass Assy. Sliding
Glass Assy. Fixed
Window Assy-Rear
Kit – Skylight Wiper (24 Volt)
Kit – Front Wiper (24 Volt)
Heater & A/C Installation – Superstructure Cab
24v Heater/Cool Kit
Acoustics Installation (Sg)
Miscellaneous Components – Cab
Cab Brackets Installation
Pedal Group Installation
Swing Brake Pedal-5v
Pedal, Throttle 5v
Valve Assembly – Brake Treadle (Complete Assembly)
Cab Crane Star Installation
Plastic Covers Installation
Console Cover Assy
Exterior Lights Install (Ce) 24v
Harness Assembly – Front Lights C. E. Conformity
Harness Assembly – Marker Light C. E. Conformity
Harness Assembly – Rear Lights C. E. Conformity
Drive Controls Installation
Steering Column W/ Cluster
Valve Assembly – Steering Control (Complete Assembly)
Boom Light Switch
Lmi Internal Light Bar Installation
Rcl Cab Kit Install, Iflex2
Rcl Cab Kit, Iflex2, Expert
Front Sun Visor Installation
First Aid Kit Installation
360 Pedal Cover Installation
Handle Installation Hoist Access
Esi-Cab
Fuse & Relay Panel Assembly
Fuse & Relay Harness Assy
Overhead Console Assembly
Harness Assembly -Overhead Cab Panel
Panel Assy-Front Console
Harness Assembly -Front Panel Cab
Harness Assembly -Superstructure Cab
Receptacle Harness
Cab Cover Installation -Rear (C.E. Conformity)
Ind Install, 3rd Wr & Override
Rework-Brake Pedal
Roller Assembly
Lmi Override Installation
Lmi Override Assy – 24v
Cab Installation -Components
Fire Extinguisher Install-Ce
Carrier Frame Complete
Frame Assembly
Outrigger Beam Installation
Outrigger Beam Assembly
Cyl Assembly -4.00 Jack
Outrigger Extension Cylinder Assembly
Cylinder Assembly Modified
Cylinder Assembly – 2 1/2″ O/R Extension (Complete Assembly)
Installation , Fender & Decking
Ladder Assembly
Engine Hood Installation
Tie Down Installation – Hook Block
Battery Box Cover Installation
Mirror Installation – Rear View
Cover Installation – Outrigger Beam
Outrigger Controller Installation
Outrigger Controller Assembly
Cable Assembly
Hardware Kit – Decal
Esi-Carrier
Wiring Harness-Carrier
Hyd Tank Installation
Hyd Tank Assembly
Filter Assembly – Return
Hyd Lines Installation -Ce
Solenoid Valve Assembly
Storage Tray With Mat Installation
Rear Axle Install W/O Diff Lock
Axle Assembly – Drive/Steer (Complete Assembly)
Diff.Carr. Group @ 4.67 Ratio
Housing & Hub Group
Planetary Hub Group
Steer Cylinder Group
Brake Group
Cylinder-Lockout
Axle Installation – Front
Tire & Wheel Installation 20.5 X 25 Mitas
Tire & Wheel Assembly 20.5 X 25 Mitas
Driveline Installation
Driveline Assembly With Center Bearing
Driveline Assembly (Complete Assembly)
Engine Install-Qsb6.7 160hp
Engine Assembly -Qsb6.7 160hp
Transmission
Converter Housing Group
Case & Rear Cover Group
Turbine Shaft Group
Drive Plate Group
Torque Converter Group
Gear Group
Auxiliary Pump Drive Group
Pump Drive Group
Forward Shaft Group
Reverse & 2nd. Shaft Group
Reverse Idler Group
Low Speed Shaft Group
3rd. Shaft Group
Idler Shaft Group
Output Shaft Group
Hi/Low Range Shift Cont. Group
Disc Brake Group
Charging Pump Group
Control Valve Mounting Group 24 Volt
Control Valve Assy.Group 24v.
Pump Assembly – Gear (Complete Assembly)
Pump Assembly – Piston (Complete Assembly)
Pump Ass’y With Flow Divider
Esi-Engine
Wiring Harness-Engine T4
Air Cleaner Assembly
Brake-Park Assy W/O Spacer
Filter Assembly (Complete Assembly)
Radiator Installation
Radiator Assembly
Fuel Tank Installation
Fuel Tank
Mounting Kit – Oil Cooler
Battery Box Installation
Battery Box Assembly
Fuse Panel Assembly
Harness Assembly -Engine Relay Panel
Battery Cable Kit
Exhaust Installation
Air Cleaner Installation
Hydraulic Oil Cooler Install
Hydraulic Oil Cooler
Idler Pulley Installation
Idler Pulley Assembly -Modified
Idler Pulley Assy
Engine Hood Grill Install-Ce
Sound Foam Engine Hood Install
Block Heater Installation -Qsb 240v
Step Installation -Hoist Access
Sound Foam Install-Engine Frame
Panel Install – Carrier Noise
Trans Oil Cooler Installation
Oms Install
Oms Installation
Control Panel Htr Install-24v
Heat Control 12v/24v Grove
Socket Assembly – 5/8″ Wedge
Decal Installation -Standard
Decal Installation -Standard Cab
Decal Installation -Standard Carrier
Decal Installation -Standard Ss
Decal Installation – Rt535e (Standard Boom)
Decal Installation -Rt530e-2 Nomenclature
Supplemental Decal Installation
Alphabetical Index
Recommended Spare Parts List
Belt And Filter Maintenance List













