Expert Support
Full Speed
100% Working
Grove Crane RT535E 226202 Parts Manual 2017
30 USD
- Description
Description
Contents:
Boom Assembly – 4 Section
Cylinder Assembly – Telescope (Complete Assembly)
Sheave Assembly – 5/8″ Rope
Kit Installation – Iflex 5 Lmi Boom
Cable Reel Lwg508 – Iflex 5
Roller Guide Assembly
Box Assembly – Junction
Flag Assembly – A2b Retainer
Connector Assembly Dummy Plug, 2-Pin
Weight And Chain Assembly (Complete Assembly)
Hook Block Assembly – 35 Metric Ton 3 Sheave
Lmi Boom Install Kit – Iflex 5
Ball Assembly – Overhaul (7.5 Ton)
Socket Assy 5/8″
Boom Angle Indicator Installation
Pointer Assembly
26′ O/S Boom Ext Install
26’boom Ext Assembly
Mast Assembly
Nose Assembly – Pin On
Sheave Assembly
Bottle Jack (Modified)
Cylinder Assembly – Bottle Jack
Carrier Installation – Jib Extension
Extension Kit Installation – Boom
Drive Installation – Turntable And (Rotek)
Turntable Section
Motor Assembly – Swing Drive (Complete Assembly)
Shaft Installation -Boom Pivot
Counterweight Installation
Swivel Installation – Electric, Water And Hydraulic
Swivel Assembly – Electric, Water And Hydraulic
Swivel Assembly – 14 Port Hydraulic, Water And Air Conditioning
Ring Assembly – Slip 15 Conductor
Valve Installation – Control Main And Future Auxiliary Hoist
Valve Assembly – Directional Control 4 Section
Valve Assy, Inlet Section
Valve Assy. Work Section
Valve Assembly – Accessory With Swing And Steer Directional Control
Hydraulic Lines Installation – Main And Future Auxiliary Hoist
Hoist Installation – Main
Hoist Assembly – Hp15c/17g (Complete Assembly)
Bolt Installation – Bearing
Mirror Installation – Hoist
Cylinder Installation -Lower Pivot & Lift
Cylinder Assembly – Lift (Complete Assembly)
Valve Assembly – Holding (Complete Assembly)
Binder Installation
Kit – Lmi S/S Iflex 5
Hydraulic Lines Installation – Cab
Kit Installation – Iflex 5 Lmi Superstructure
Condenser Installation – Air Conditioning
Kit – Air Conditioner Condenser (Complete Assembly)
Pin Installation – Turntable Lock
Cover Installation – Valve
Lube Installation – Turntable Bearing Manual
Cab Installation
Cab Assembly
Cab
Door Installation – Cab (Not Available As Assembly)
Kit – Skylight Wiper (Complete Assembly)
Kit – Front Wiper (Complete Assembly)
Skylight Assembly – Sliding (Complete Assembly)
Window Assembly – Rear (Complete Assembly)
Window Assembly – Right Hand (Complete Assembly)
Fan Assembly – 12 Volt Cab (Complete Assembly)
Seat Installation – Control Without Auxiliary Hoist Control
Seat Assembly – Control Without Auxiliary Hoist Control
Switch Assembly – Proximity (Normally Open)
Controller Assembly – 8-32 Volt Left Hand Armrest
Controller Assembly – 8-32 Volt Right Hand Armrest
Handle Assy. W/Thumper
Harness Assembly – Seat (Complete Assembly)
Acoustics Installation
Console Installation – Front
Console Assembly – Front (Complete Assembly)
Harness Assembly – Front Console (Complete Assembly)
Gauge, 12 Volt Tachometer (With Hourmeter)
Electrical System Installation – Superstructure Cab
Panel Assembly – Fuse And Relay (Superstructure Cab)
Harness Assembly – Fuse And Relay Panel (Superstructure Cab)
Heater/Cooler Installation – Cab
Kit – Cab Heater And Air Conditioner (Complete Assembly)
Screen Installation – Sun
Kit – Lmi Iflex 5 Cab (Complete Assembly)
Centeral Unit – Iflex 5
Console Assembly – Iflex 5 Graphic (Complete Assembly)
Electrical System Installation – Superstructure
Harness Assembly – Superstructure Tier 2
Lmi Cab Installation – Iflex5
Switch Installation – Air Conditioner
Lines Installation – Air Conditioning (Cab)
Kit – Air Conditioner Hose (Complete Assembly)
Cover Installation – Rear Cab
Pedals Installation – Without Auxiliary Hoist
Valve Assembly – Brake Treadle (Complete Assembly)
Controls Installation – Steer And Drive
Valve Assembly – Steering Control (Complete Assembly)
Column Assembly – Modified Tilt Steering (Complete Assembly)
Column Assembly – Tilt Steering (Complete Assembly)
Harness Assembly – Turn Signal/Washer (Complete Assembly)
Harness Assembly – Shifter (Complete Assembly)
Frame – Carrier (For Reference Only)
Frame Assembly
Beam Install – Outrigger (Not Available As Assembly)
Beam Assembly – Outrigger (Complete Assembly)
Cylinder Assembly – 4″ Outrigger Jack (Complete Assembly)
Cylinder Assembly – 2 1/2″ Outrigger Extend
Cylinder Assembly – 2 1/2″
Fender & Decking Installation
Hood Installation – Engine
Float Installation – Outrigger
Float Assembly – Outrigger (Complete Assembly)
Lights Installation – Exterior (Domestic)
Tie Down Installation – Hook Block
Cover Installation -Battery Box
Mirror Installation – Rear View
Step Installation
Hardware Kit – Decal
Electrical System Installation – Carrier
Harness Assembly – Carrier (Complete Assembly)
Panel Assembly – Engine Relays (Complete Assembly)
Harness Assembly – Engine Relay Panel (Complete Assembly)
Harness Assembly – Carrier Engine Battery Power
Tank Installation – Hydraulic
Reservoir Assembly – Hydraulic (Complete Assembly)
Filter Assy. Hyd. Return
Ladder Assembly (Complete Assembly)
Valve Installation – Hydraulic (Carrier)
Valve Assembly – Outrigger Control 4 Section
Valve Assembly – Park Brake Range Shift (Complete Assembly)
Valve Assembly – Axle Lockout (Complete Assembly)
Valve Assembly – Outrigger Selector Rear Steer
Cover Installation – Outrigger Box
Hydraulic Lines Installation – Carrier
Tray Installation – Storage
Axle Installation – Rear
Axle Assembly – Drive/Steer (Complete Assembly)
Diff. Carrier Group
Housing Group
Hub & Shaft Group
Brake Assy. Parts Group 2-Set
Brake Assembly , Parts Group
Cylinder Assembly – 2 1/2″ Steer (Complete Assembly)
Cylinder Assembly – 5″ Lockout (Complete Assembly)
Axle Installation – Front
Tire And Wheel Installation 20.5 X 25
Tire And Wheel Assembly 20.5 X 25 General
Wheel & Disc Assy
Driveline Installation
Driveline Assembly With Center Bearing
Driveline Assembly (Complete Assembly)
Engine Installation – Cummins Qsb155c Tier 2
Engine Assembly – Cummins Qsb155c Tier 2
Transmission Assembly – 3 Speed (Complete Assembly)
Converter Housing Group
Case & Rear Cover Group
Turbine Shaft Group
Drive Plate Group
Torque Converter Group
Gear Group
Auxiliary Pump Drive Group
Pump Drive Group
Forward Shaft Group
Reverse & 2nd. Shaft Group
Reverse Idler Group
Low Speed Shaft Group
3rd. Shaft Group
Idler Shaft Group
Output Shaft Group
Hi/Low Range Shift Cont. Group
Disc Brake Group
Charge Pump & Filter Group
Control Valve Mounting Group
Control Valve Assy. Group
Brake Assembly – Parking (Complete Assembly)
Pump Assembly – Piston (Complete Assembly)
Pump Assembly – Gear (Complete Assembly)
Electrical System Installation – Engine Tier 2
Harness Assembly – Engine (Complete Assembly)
Kit – Cable (Engine) (Complete Assembly)
Harness Assembly – Engine Coolant Level
Radiator Installation
Radiator Assembly (Not Available As Assembly)
Cooler Assembly – Radiator With Side Tank Cooler
Tank Assembly – Surge (Not Available As Assembly)
Tank Installation – Fuel
Tank Assembly – 58 Gallon Fuel (Complete Assembly)
Battery Installation
Kit – Cable (Battery) (Complete Assembly)
Exhaust System Installation
Intake Installation – Air
Cleaner Assembly – Air (Complete Assembly)
Compressor Installation – Air Conditioner
Kit – Cummins Air Conditioner Compressor (Complete Assembly)
Kit – Carrier A/C Hose
Grill Installation – Engine Hood
Electrical System Installation – Model Identifier
Miscellaneous Decals
Decal Installation – Rt535/540e (Standard)
Decal Installation – Rt535e (Standard Cab)
Decal Installation – Rt535e (Standard Carrier)
Decal Installation – Rt535e (Standard Superstructure)
Decal Installation – Rt535e (Standard Boom)
Decal Installation – Rt535e (Nomenclature)













