Expert Support
Full Speed
100% Working
Grove Crane RT540E 258288 Parts Manual 2009
20 USD
- Description
Description
Contents:
Boom Assy 102’
Cylinder Assembly – Telescope (Complete Assembly)
Sheave Assembly – 5/8″ Rope
Alarm Installation – Lmi
Cable Assembly – Lmi Alarm (Complete Assembly)
Kit Installation – Iflex 5 Lmi Boom
Cable Reel Lwg508 – Iflex 5
Roller Guide Assembly
Box Assembly – Junction
Flag Assembly – A2b Retainer
Connector Assembly Dummy Plug, 2-Pin
Weight And Chain Assembly (Complete Assembly)
Hook Block Assembly – 40 Ton 3 Sheave
Lmi Boom Installation Kit-Iflex 5
Socket Assy 5/8″
Boom Angle Indicator Installation
Pointer Assembly
Cover Installation – Boom Hole
Cab Installation (C.E. Conformity)
Cab Assembly (C.E. Conformity)
Cab Weld
Door Installation – Cab (Not Available As Assembly)
Kit – Skylight Wiper (Complete Assembly)
Kit – Front Wiper (Complete Assembly)
Window Assembly – Rear (Complete Assembly)
Window Assembly – Right Hand (Complete Assembly)
Fan Assembly – 12 Volt Cab (Complete Assembly)
Extinguisher, Fire
Seat Installation Without Auxiliary Hoist
Seat Assembly Without Auxiliary Hoist
Switch Assembly – Proximity (Normally Open)
Controller Assembly – 8-32 Volt Left Hand Armrest
Controller Can 12v Rh Armrest
Harness Assembly – Seat (Complete Assembly)
Acoustics Installation
Console Installation – Front (Rt540e/Rt530e2)
Console Assembly – Front (Rt540e/Rt530e2)
Harness Assembly – Front Console (Complete Assembly)
Gauge, 12 Volt Tachometer (With Hourmeter)
Electrical System Installation – Superstructure Cab
Panel Assembly – Fuse And Relay (Superstructure Cab)
Harness Assembly – Fuse And Relay Panel (Superstructure Cab)
Heater/Cooler Installation – Cab
Kit – Cab Heater And Air Conditioner (Complete Assembly)
Screen Installation – Sun
Binder Installation
Kit, Lmi S/S Iflex 5
Kit Installation – Iflex 5 Lmi Superstructure
Kit – Iflex2 Lmi Cab (Complete Assembly)
Electrical System Installation – Superstructure
Harness Assembly – Superstructure (Complete Assembly)
Handle Installation Hoist Access
Cover Installation – Rear Cab
Pedals Installation – Without Auxiliary Hoist
Valve Assembly – Brake Treadle (Complete Assembly)
Controls Installation – Steer And Drive
Valve Assembly – Steering Control (Complete Assembly)
Column Assembly – Modified Tilt Steering (Complete Assembly)
Column Assembly – Tilt Steering (Complete Assembly)
Harness Assembly – Turn Signal/Washer (Complete Assembly)
Harness Assembly – Shifter (Complete Assembly)
Indicator Installation – 3rd Wrap
Indicator Installation – Low Steer Pressure
Step Installation Hoist Access
Hydraulic Lines Installation – Main And Future Auxiliary Hoist
Hydraulic Lines Installation – Cab
Hydraulic Lines Installation – (C.E. Conformity)
16mm Dia Hoisting Wire Rope –
Hoist Installation – Main (C.E. Conformity)
Hoist Assembly – Hp15c/17g With 3rd Wrap
Hoist Cover Installation – Main (C.E. Conformity)
Foam Kit-Hoist (M)
Turntable Weld And Drive Installation
Motor Assembly – Swing Drive (Complete Assembly)
Shaft Installation -Boom Pivot
Counterweight Installation (C.E. Conformity)
Swivel Installation – Electric, Water And Hydraulic
Swivel Assembly – Electric, Water And Hydraulic
Swivel Assembly – 14 Port Hydraulic, Water And Air Conditioning
Ring Assembly – Slip 15 Conductor
Control Valve Installation – Main And Auxiliary Hoist
Valve Assembly – Directional Control 4 Section
Valve Assembly – Accessory With Swing And Steer Directional Control
Accumulator Assembly – Hydraulic Oil
Bolt Installation – Bearing
Cylinder Installation -Lower Pivot & Lift
Cylinder Assembly – Lift (Complete Assembly)
Valve Assembly – Holding (Complete Assembly)
Pin Installation – Turntable Lock
Valve Cover Installation
Mirror Installation – Turntable
Lube Installation – Turntable Bearing Manual
Counterweight Installation
Valve Foam Cover Installation
Cover Installation – Bottom
Foam Cover Installation -Bottom
Hood Installation – Engine
Engine Installation
Engine Assembly – Cummins Qsb6.7 (Not Available As Assembly)
Transmission Assembly – 6 Speed 12 Volt
Converter Housing Group
Case & Rear Cover Group
Turbine Shaft Group
Drive Plate Group
Torque Converter Group
Gear Group
Auxiliary Pump Drive Group
Pump Drive Group
Forward Shaft Group
Reverse & 2nd. Shaft Group
Reverse Idler Group
Low Speed Shaft Group
3rd. Shaft Group
Idler Shaft Group
Output Shaft Group
Hi/Low Range Shift Cont. Group
Disc Brake Group
Charge Pump & Filter Group
Control Valve Mounting Group
Control Valve Assy. Group
Brake Assembly – Parking (Complete Assembly)
Pump Assembly – Gear (Complete Assembly)
Pump Assembly – Piston (Complete Assembly)
Electrical System Installation – Engine
Harness Assembly – Engine (Complete Assembly)
Kit – Cable (Engine) (Complete Assembly)
Radiator Installation
Radiator Assembly (Not Available As Assembly)
Cooler Assembly – Radiator/Charge Air (Complete Assembly)
Tank Assembly – Surge (Not Available As Assembly)
System Installation – Exhaust
Air Cleaner Installation
Cleaner Assembly – Air (Complete Assembly)
Oil Cooler Installation – Hydraulic
Grill Installation -Engine Hood
Foam Installation -Engine Hood
Heater Installation – Block
Fan Installation -Ce Configure
Foam Installation – Engine
Kit, Foam
Driveline Installation
Driveline Assembly With Center Bearing
Driveline Assembly (Complete Assembly)
Axle Installation – Rear Without Differential Lock
Axle Assembly – Drive/Steer (Complete Assembly)
Diff.Carr. Group @ 4.67 Ratio
Housing & Hub Group
Planetary Hub Group
Steer Cylinder Group
Brake Group
Cylinder Assembly – 5″ Lockout (Complete Assembly)
Axle Installation – Front
Tire And Wheel Installation Jiangsu 16×25
Tire And Wheel Assembly Jiangsu 16×25
Float Installation – Outrigger
Float Assembly – Outrigger (Complete Assembly)
Cover Installation – Outrigger Beam
Cover Installation – Outrigger Box
Carrier Frame Complete (C.E. Conformity)
Carrier Frame-C.E. Conformity
Carrier Frame Assembly
Outrigger Beam Installation
Ourtrigger Beam Assembly
Cylinder Assembly – 4″ Outrigger Jack (Complete Assembly)
Outrigger Extension Cylinder Assembly
Cylinder Assembly Modified
Cylinder Assembly – 2 1/2″ O/R Extension (Complete Assembly)
Decal Installation Rt535e/540e-Standard
Decal Installation Rt540e Standard-Cab
Decal Installation – Rt535e (Standard Carrier)
Decal Installation – Rt535e (Standard Superstructure)
Decal Installation – Rt535e (Standard Boom)
Fender And Deck Installation Hoist Access
Decal Installation – Rt540e (Nomenclature)
Lights Installation – Exterior (C.E. Conformity)
Head/Turn Signal Signal Light Assembly – Left Hand
Head/Turn Signal Signal Light Assembly – Right Hand
Harness Assembly – Front Lights C. E. Conformity
Harness Assembly – Marker Light C. E. Conformity
Harness Assembly – Rear Lights C. E. Conformity
Tie Down Installation – Hook Block
Cover Installation -Battery Box
Mirror Installation – Rear View
Step Installation
Hardware Kit – Decal
Electrical System Installation – Carrier (Rt540e/Rt530e2)
Harness Assembly – Carrier (Complete Assembly)
Panel Assembly – Engine Relays (Complete Assembly)
Harness Assembly – Engine Relay Panel (Complete Assembly)
Supplemental Decal Installation
Tank Installation – Hydraulic
Reservoir Assembly – Hydraulic (Complete Assembly)
Filter Assy. Hyd. Return
Ladder Assembly (Complete Assembly)
Valve Installation – Hydraulic (Carrier)
Valve Assembly – Outrigger Control 4 Section
Valve Assembly – Park Brake Range Shift (Complete Assembly)
Valve Assembly – Outrigger Selector Rear Steer
Valve Assembly – Differential Lockout C. E. Conformity
Tray Installation – Storage
Tank Installation – Fuel
Tank Assembly – 58 Gallon Fuel (Complete Assembly)
Mounting Kit – Oil Cooler
Battery Installation
Kit – Cable (Batteries) Rt535
Mirror Installation – Hoist (Ce With Main Hoist Only)
Counterweight Foam Installation (Italian)
Counterweight Foam Kit
Panel Install – Carrier Noise













