Expert Support
Full Speed
100% Working
Grove Crane RT58 35053 Parts Manual 2018
30 USD
- Description
Description
Contents:
Boom Assy. ( 3 Section )
Boom Base Section Assembly
Mid Section-22′
Boom Nose/Fly Section(For Reference Only)
Nose Assembly – 3 Sheave Boom
Sheave Wheel Assembly
Cylinder Box Assembly
4″ Dia Tele Cyl Assy 18′ Strok
Cylinder Assembly -Telescope
Elevation Indicator -Right Hand Boom
Elevation Indicator -Left Hand Boom
Hook Block Assembly
Ball Assembly – 150# Headache
Turntable Drive Assy.
Box Assembly – Swing
Brake Assembly – Swing
Brake Assembly – Disc
Cylinder Assembly – Swingbrake Release
Motor Assembly – Orbit
Turntable Mast Assy.
Lift Cyl.& Hold Valve Install
Cylinder Assembly -Lift
Valve Assembly – Check
Control Valve & Linkage Install
Valve Bank Assembly -2 Section (A-35 Series)
Valve Section – Inlet(A-35 Series)
Valve Assembly – Relief2250 Psi
Cartridge Assembly
Valve Assembly – Outlet
Valve Assembly – 4-Way Section(A-35 Series)
Valve Assembly – Relief1000 Psi
Valve Bank Assembly -1 Section (A-35 Series)
Valve Section – Relief
Valve Assembly – Relief
Valve Bank Assembly -4 Section (A-20 Series)
Valve Assembly – Sectioninlet (A-20 Series)
Valve Section – 4 Way
Valve Assembly – 4-Way Section
Hoist Installation – Main
Hoist Assembly -Model 15a-11
Gear Reduction Assembly
Motor Assembly – Hydraulic
Hose Reel Assembly -Right Hand
Lift Hyd. Schematic
Tele.Mid Hyd. Schematic
Tele.Fly Hyd. Schematic
Model 15 Hoist Hyd. Schematic
Hyd Swivel Install (9 Port)
Swivel Assembly -Hydraulic
Supply.Press.& Return Hyd.Sch
Valve Install. By-Pass
Control Assembly -Orbitrol Unit
Valve Assembly – Relief(See Separate Parts List)
Cab Installation
Control Console Assy. & Install
Park Brake Install.
Windshield Defroster Install
Rear Steer Indicator Install
Lock Installation – Window(Not Available As Assembly )
Extinguisher Installation – Fire
Transmission Shift Linkage
Shift Installation- Axle Range
Front Axle Installation
Axle Assembly
Axle Assembly Mechanical Park Brake Assembly
Axle Assembly Housing Assembly
Axle Assembly Differential Carrier Assembly
Axle Assembly Hub And Shaft Group
Axle Assembly Brake Assembly
Axle Assembly Wheel Cylinder Assembly
Cylinder Assembly – 3″ Steer (Complete Assembly )
Rear Axle Installation
Axle Assembly – Drive Steer
Axle Assembly – Drive Steer Housing Assembly
Axle Assembly – Drive Steer Differential Carrier Assembly
Axle Assembly – Drive Steer Hub And Shaft Group
Axle Assembly – Drive Steer Brake Assembly
Axle Assembly – Drive Steer Wheel Cylinder Assembly
Front & Rear O/R. Install.
Cylinder Assembly -Outrigger
Valve Assembly – Solenoid
Eng. Assy Cummins V-378
Engine Hood Installation
Cleaner Assembly – Air
Quick Start Installation
Battery Installation
Torque Converter Assembly
Torque Converter Assembly converter Assembly
Torque Converter Assembly housing Group And Parts
Torque Converter Assembly pump Group – Charging Parts
Torque Converter Assembly pump Group
Torque Converter Assembly remote Mount – Oil Filter
Torque Converter Assembly filter Assembly
Filter Assembly – Oil
Torque Converter Assembly drive Plate Assembly
Pump Assembly -(W/O Return To Center Steer ing)
Driveline Assembly
Hyd.& Fuel Tank/Tool Box Inst.
Fuel Tank And Battery Box Assembly
Hydraulic Reservoir Assembly
Hydrovac. Brake/Lines Install
Hydrovac Assembly
Tire And Wheel Assembly
Front Cover Installation
Cover Installation
Hyd.Oil Filter Install
Hyd.Lockout Cyl.Install.
Cylinder Assembly
Valve Assembly – Selector
Frt. Steer Hyd. Lines.
Hydraulic Lines Installation – Rear Steer
Axle Lockout Hyd. Lines Install
Guard Installation -Muffler
Transmission Installation
Transmission Assembly
Transmission Assembly front Cover And Input
Transmission Assembly main Case Group
Transmission Assembly first Stage Clutch Assembly
Transmission Assembly second Stage Clutch Assembly
Transmission Assembly third Clutch Group
Transmission Assembly oil Strainer Group
Transmission Assembly oil Retainer Group
Transmission Assembly disconnect Output Assembly
Transmission Assembly output Group
Transmission Assembly yoke Group
Driveline Assembly -Transmission
Driveline
Trans&Torque Conver Line Inst
Brake & Accelerator Pedal Inst
Cylinder Assembly – Master
Heater Installation
Heater Assembly
Horn Installation
Windshield Wiper Installation
Motor Assembly -Windshield Wiper
O/R Hyd. Schematic
Non-Free Swing Hyd. Schem.
Decal Installation
Alphabetical Index
Numeric Index
Recommended Spare Parts List
Belt And Filter Maintenance List
Foot Note Index













