Expert Support
Full Speed
100% Working
Grove Crane RT58B 222623 Parts Manual 2014
20 USD
- Description
Description
Contents:
Boom Assembly – 3 Section
Cylinder Assembly – 6.50” Telescope
Hook Block Assembly – 22 Ton
Sheave Wheel Assembly (Not Available As Assembly)
Cable Assembly – Jumper
Weight And Chain Assembly (Complete Assembly)
Jib Installation – 23′
Carrier Installation – Jib Boom
Sheave Installation
Pat System Installation
Pat System Installation Basic Components – Lmi
Weight And Chain Assembly
Reel Assembly – Cable
Roller Guide Assembly
Console Assembly – Ds350g
Central Unit Assembly, 12 Volt
Pat System Installation Reel Assembly – Cable
Pat System Installation Console Assembly – Ds350g
Pat System Installation Central Unit Assembly
Pat System Installation Pressure Transducer
Pat System Installation 23′-38′ Tele Jib – Lmi
Pat System Installation Auxiliary Boom Nose – Lmi
Pat System Installation A-Frame Jib – Lmi
Pat System Installation Anti 2 Block Weight Assembly
Pat System Installation Wiring Diagram
Pat System Installation Basic Components – Ei20
Console Assembly Ei20
Pat System Installation Console Assembly – E120
Pat System Installation 23′-38′ Tele Jib – Ei20
Pat System Installation Auxiliary Boom Nose – Ei20
Pat System Installation A-Frame Jib – Ei20
Pat System Installation Basic Components – Ei10
Pat System Installation Console Assembly – E110
Console Assembly Ei10
Pat System Installation 23′-38′ Tele Jib – Ei10
Pat System Installation Auxiliary Boom Nose – Ei10
Pat System Installation A-Frame Jib – Ei10
Pat System Installation Wiring Diagrams
Pat System Installation Basic Components – A2b
Console Assembly Anti 2 Block
Pat System Installation Console Assembly – A2b
Pat System Installation 23′-38′ Tele Jib – A2b
Pat System Installation Auxiliary Boom Nose – A2b
Pat System Installation A-Frame Jib – A2b
Sheave Installation – Boom Nose
Sheave Assembly – Complete
Pat 031300150016 Mt6 Kit Main
A2b System Components
Extension Installation, Fixed Swing Away – Ds350
Protection Bar Installation – Jib
Mtg Kit Lmi – Jic
Lmi System Kit Ds350 (1219)
Console Assembly – Ds350gw With Light Bar Interface
Turntable Installation
Counterweight Installation
Cylinder Installation – 9.00” Lift
Cylinder Assembly – 9″ Lift
Swivel Installation – Electric Hydraulic
Swivel Assembly – Electric And Hydraulic
Swivel Assembly – Hydraulic 7 Port
Swivel Assembly
Swivel Assembly – 7 Port Hydraulic
Electric Swivel Installation
Ring Assembly – Slip
Electrical System Installation
Harness Assembly – Hoist Rotation Sensor
Turntable Lock Installation
Pivot Shaft Installation – Boom
Hoist Installation – 15b-16g
Hoist Cplt – H015b-16g
Hoist Assembly – Ho15b – 16g
Valve Assembly – Motor Control
Brake Assembly
Tubing Installation – Hoist
Gear Reduction Assembly
Motor Assembly – Hydraulic Vane Type
Idler & Follower Install (Ho15b,
Kicker Bar Installation
Kicker Bar Assembly
Rotation Sensor Installation
Harness Assembly – Rotation Sensor
Binder Installation
Control Valve And Linkage Installation
Valve Assembly – 2 Section Control
Bank Assembly – 4 Section Control Valve
Valve Assembly – Outlet
Valve Assembly – 1 Section Control
Valve Assembly – Solenoid
Valve Assembly – Flow Divider
Hydraulic Lines Installation – Mid-Telescope
Hydraulic Lines Installation – Swing
Hydraulic Lines Installation – Lift
Hydraulic Lines Installation – Main Hoist
Hose Clamps Installation – Main Hoist
Turntable Drive Assembly Components
Swing Box Installation
Pinion Assembly
Swing Box Assembly – Complete
Swing Box And Brake Assembly (Complete Assembly)
Brake Assembly – Swing (Complete Assembly)
Motor Assembly – Orbit
Hydraulic Lines Installation – Lever Lockout
Test Panel Installation – Hydraulic
Power Steering And Horn Installation
Valve Assembly – Steering Control
Cover Installation – Seat Support
Handrail Installation
Controls Installation
Shifter Assembly
Shift Control Assembly
Hydraulic Lines Installation – Test Panel
Circular Level Installation
Cab Installation (With Doors)
Cab Weldment (With Doors)
Door Assembly – Cab
Console Inst’l
Console Assy
Extinguisher Installation – Fire
Seat Installation
Seat Assembly – Cloth
Mirror Installation – Rear
Brake & Accel Pedal Inst
Accelerator Pedal Assy
Accelerator Pedal Design “B”
Accelerator Pedal Design “A”
Heater Installation
Heater Assembly – Hot Water
Cover Installation – Hot Water Heater
Fan Installation – Cab Circulating
Fan Assembly – 12 Volt Cab (Complete Assembly)
Mat Installation – Floor
Wiper Inst
Windshield Washer Installation
Inst & Lts W/O Tach
Console Assy W/O Tach
Electrical System Installation – Front Console
Ha-Console
Frame Assembly
Stud Installation – Weld
Axle Installation – Front
Axle Assembly – Front (Complete Assembly)
Axle Assembly – Drive/Steer (Complete Assembly)
Axle Assembly – Drive/Steer Differential Assembly
Axle Assembly – Drive/Steer Housing Group
Axle Assembly – Drive/Steer Hub And Shaft Group
Axle Assembly – Drive/Steer Brake Group
Disc-Brake Assembly
Axle Assembly – Drive/Steer Brake Assembly
Cylinder Assembly – 2 1/2″ Steer ( Also Used As A Cab Tilt Cylinder )
Axle Installation – Rear
Axle Assembly – Rear
Cylinder Assembly – 5″ Lockout (Complete Assembly)
Outrigger Installation
Cylinder Assembly – 7.00” Outrigger Jack
Outrigger Valve Installation
Valve Assembly – Outrigger Solenoid
Reservoir Installation – Hydraulic
Filter Assembly – Oil
Tank Installation – Fuel
Tank Assembly – Fuel
Tank Assembly – 60 Gallon Fuel
Hardware Kit – Decal
Lights Installation – Front And Rear
Alarm Installation – Back-Up
Trans & Torque Lines Install
Brake System
Cylinder Assembly – Hydraulic Master
Brake Booster And Master Cylinder Assembly
Cylinder Assembly – Brake Booster And Master
Valve Assembly – Flow Control
Valve Assembly – Relief
Valve Installation – Rear Axle Lockout
Valve Assembly – Rear Axle Lockout
Harness Assembly – Carrier
Step And Grab Handle Installation
Cover Installation – Front
Tire And Wheel Installation 20.5 X 25
Tire And Wheel Assembly 20.5 X 25 General
Wheel & Disc Assy
Fender Installation
Decal Install Rt58d-Nomencltre
Hydraulic Lines Installation – Outrigger
Front Steer Lines Inst
Rear Steer Lines W/O Winch
Hydraulic Schematic – Axle Lockout
Switch Installation – Audio Visual Warning
Door Installation – Battery Box
Hydraulic Lines Installation – Supply, Pressure And Return
Engine Installation – (For Reference Only)
Engine Assembly – With Pump Disconnect
Converter Installation – Torque (Not Available As Assembly)
Converter Assembly – Torque
Pump Assembly – (W/O Return To Center Steering)
Pump Installation (Not Available As Assembly)
Pump Assembly – 3 Stage Tandem
Disconnect Assembly – Pump
Electrical System Installation – Engine
Harness Assembly – Engine
Engine Components
Air Cleaner And Exhaust Installation
Cleaner Assembly – Air (Complete Assembly)
Pump Cover Installation
Trans Install- Sohpd T20641
Trans Assy- Sohpd T20641
Transmission Assembly
Flange Group
Case & Rear Cover Group
Shaft And Front Cover Group
Gear Group
Shaft Group – Forward
Shaft Group – Reverse And Second
Reverse Idler Group
Shaft Group – Low Speed
Shaft Group – Third
Shaft Group – Idler
Shaft Group – Output
Control Group – Hi-Low Shift
Mounting Group – Control Valve
Control Valve Assy
Disc Brake Group
Brake Assembly – Parking (Complete Assembly)
Valve Assy
Valve Assembly – Solenoid (Complete Assembly)
Valve Assembly – 4-Way Solenoid
Hood Installation – Engine
Hood Assembly – Engine
Door Assembly – Right Hand
Door Assembly – Left Hand Side
Driveline Installation
Driveline Assembly (Complete Assembly)
Quick Start Installation – Cummins 6bt5.9
Radiator Installation
Radiator Assembly
Battery Installation
Ball Assembly – Overhaul 7 Ton Swivel
Socket Assembly – 5/8″ Wedge (Complete Assembly)
Miscellaneous Decals
Decal Install Rt58b,C,D,E-Std













