Expert Support
Full Speed
100% Working
Grove Crane RT58B 83238 Parts Manual 2019
40 USD
- Description
Description
Contents:
Boom Assembly -Domestic
Cylinder Assembly – 6.50”Telescope
Support Assembly -Telescope Cylinder
Protection Bar Installation – Jib
Block Assembly – One Sheave 12 Ton Pivot Hook
Sheave Assembly – Complete
Sheave Installation -Boom Nose
Turntable Installation
Counterweight Installation
Hoist Installation – Main
Hoist Assembly -Model Ho15b-16
Valve Assembly – Motor Control
Brake Assembly
Tubing Installation -Hoist
Gear Reduction Assembly
Motor Assembly – Hydraulic Vane Type
Cylinder Installation – 9.00”Lift
Cylinder Assembly – 9″Lift
Cable Follower And Idler Drum Installation
Control Valve And Linkage Installation
Valve Assembly – 2 Section Control
Bank Assembly – 4 Section Control Valve
Valve Assembly – Outlet
Valve Assembly – 1 Section Control
Valve Assembly – Solenoid
Valve Assembly -Flow Divider
Turntable Lock Installation
Indicator Installation -Main Hoist Rotation
Hydraulic Lines Installation -Swing
Hydraulic Lines Installation – Lift
Hydraulic Lines Installation -Mid-Telescope
Hydraulic Lines Installation -Main Hoist
Hydraulic Lines Installation -Lever Lockout
Hose Clamps Installation – Main Hoist
Pivot Shaft Installation -Boom
Turntable Drive Components Assembly
Swing Box Installation
Box Assembly – Swing
Swing Box And Brake Assembly
Brake Assembly – Swing(Complete Assembly )
Motor Assembly – Orbit
Test Panel Installation -Hydraulic
Swivel Installation -Electric/Hydraulic
Swivel Assembly -Electric/Hydraulic
Swivel Assembly -Hydraulic 7 Port
Swivel Assembly
Swivel Assembly – 7 Port Hydraulic
Console Installation – Front
Shift Installation -Axle And Range
Shift Installation -Transmission
Transmission Kit – Shift
Control Lever Assembly
Power Steering And Horn Installation
Valve Assembly – Steering Control
Brake And Accelerator Pedal Installation
Accelerator Pedal Assy
Accelerator Pedal Design “B”
Accelerator Pedal Design “A”
Park Brake Installation
Seat Installation
Seat Assembly – Cloth
Electrical System Installation
Extinguisher Installation – Fire
Cab Installation (With Doors)
Cab Weldment (With Doors)
Door Assembly – Cab
Heater Installation
Heater Assembly -Hot Water
Cover Installation – Hot Water Heater
Fan Installation – Cab Circulating
Fan Assembly – 12 Volt Cab(Complete Assembly )
Mat Installation – Floor
Windshield Wiper Installation
Windshield Washer Installation
Mirror Installation – Rear
Circular Level Installation
Cover Installation -Seat Support
Handrail Installation
Hydraulic Lines Installation -Test Panel
Sk960139
Console Assembly
Harness Installation -Console
Harness Assembly – Console
Sk960138
Instruments And Lights Installation
Supplementary Electrical Lines
Swivel Installation -Electric
Slip Ring Assembly – 22conductor
Plate Assembly – Mounting
Frame Section
Axle Installation – Front
Front Axle Assembly
Axle Assembly – Front
Axle Assembly – Front Differential Carrier Parts
Axle Assembly – Front Housing Parts
Axle Assembly – Front Wheel End Parts
Axle Assembly – Front Brake Assembly
Cylinder Assembly – 3″Steer
Axle Installation – Rear
Axle Assembly – Rear
Axle Assembly – Rear Differential Carrier Parts
Axle Assembly – Rear Housing Parts
Axle Assembly – Rear Wheel End Parts
Axle Assembly – Rear Brake Assembly
Cylinder Assembly – 5″Lockout
Outrigger Installation
Cylinder Assembly -7″ Outrigger Jack
Transmission Installation
Transmission Assembly
Transmission Assembly Case And Cover Group
Transmission Assembly Idler Shaft And Front Cover
Transmission Assembly Forward Shaft Group
Transmission Assembly Reverse Idler Group
Transmission Assembly Reverse And Second Shaft
Transmission Assembly Low Speed Shaft Group
Transmission Assembly Third Shaft Clutch Group
Transmission Assembly Idler Shaft Group
Transmission Assembly Output Shaft Group
Transmission Assembly Hi And Low Range Shift
Transmission Assembly Control Valve
Bottom Cable Entry Kit
Engine Installation -Cummins 6bt5.9
Filter Assembly – Oil
Pump Assembly -(W/O Return To Center Steering)
Muffler Installation
Hood Installation – Engine
Door Assembly – Right Hand
Door Assembly – Left Hand Side
Pump Cover Installation
Cleaner Installation – Air
Cleaner Assembly – Air
Radiator Installation
Driveline Installation
Driveline Assembly
Torque Converter Installation
Torque Converter Assembly
Harness Installation -Cummins 6bt5.9
Harness Assembly – Engine
Pump And Disconnect Installation -3 Section
Disconnect Assembly – Pump
Pump Assembly – 3 Stagetandem
Reservoir Installation -Hydraulic
Tank Installation – Fuel
Hydraulic Lines Conveter And Transmission
Power Boost And Brake Lines Installation
Cylinder Assembly -Master With Power Head
Power Brake Assembly
Cylinder Assembly – Brake Master
Valve Assembly -Flow Control
Valve Assembly – Relief
Valve Installation – Rear Axle Lockout
Valve Assembly – Rear Axle Lockout
Electrical System Installation -Carrier
Harness Assembly – Carrier
Step And Grab Handle Installation
Cover Installation – Front
Lights Installation – Front And Rear
Fender Installation
Alarm Installation -Back-Up
Quick Start Installation
Indicator Installation – Rear Steer
Switch Assembly – Limit
Hydraulic Lines Installation -Supply, Pressure And Return
Hydraulic Lines Installation – Outrigger
Hydraulic Lines Installation – Front Steer
Hydraulic Lines Installation – Rear Steer
Hydraulic Schematic – Axle Lockout
Indicator Installation -Air Restriction
Lug Nut And Washer Installation
Outrigger Valve Installation
Valve Assembly – Outrigger Solenoid
Warning System Installation
Switch Installation -Engine Distress
Tire And Wheel Assembly -General 17.5 X 25
Door Installation -Battery Box
Battery Installation
Heater Installation -Diesel Fuel
Junction Box And Engine Heater Electrical System
Decal Installation – Rt58b













