Expert Support
Full Speed
100% Working
Grove Crane RT58C 42969 Parts Manual 2022
40 USD
- Description
Description
Contents:
Trapezoidal Boom Assy.& Inst.
Cylinder Assembly – 6.50”Telescope
Protection Bar Installation – Jib
Elevation Indicator Installation – Boom
Elevation Indicator -Left Hand Boom
Elevation Indicator -Right Hand Boom
Boom Extension Installation – 20′
Carrier Installation -Boom Extension
Turntable Drive Assembly & Installation
Swing Box Assy Complete-Mod Gb
Swing Box And Brake Assembly
Brake Assembly – Swing
Motor Assembly – Orbit
Counterweight Installation
Hoist Installation -Main And/Or Auxiliary
Hoist Assembly -Model Ho15b-11
Gear Reduction Assembly
Motor Assembly – Hydraulic
Cylinder Installation -Lift
Cylinder Assembly – Lift
Swivel Installation -Electro-Hydraulic
Swivel Assembly – 7 Port Hydraulic
Control Valve And Linkage Installation
Valve Bank Assembly -2 Section (A-20 Series)
Valve Assembly – Section inlet (A-20 Series)
Valve Section – 4 Way
Valve Bank Assembly -4 Section (A-35 Series)
Valve Section – Inlet(A-35 Series)
Valve Assembly – Outlet
Valve Assembly – 4-Way Section(A-35 Series)
Valve Section – Relief
Valve Assembly – Relief
Valve Assembly – Relief1000 Psi
Relief Valve
Cartridge Assembly
Valve Bank Assembly – Onesection A-35 Series
Valve Assembly – Relief2250 Psi
Hydraulic Lines Installation -Swing
Hydraulic Lines Installation – Lift
Hydraulic Lines Installation -Mid-Telescope
Hydraulic Lines Installation -Main Hoist
Hose Clamps Installation – Main Hoist
Idler Drum Assembly
Console Installation -Front
Shift Installation -Axle And Range
Shift Installation -Transmission
Transmission Kit – Shift
Control Lever Assembly
Power Steering And Horn Installation
Valve Assembly – Steering control
Park Brake Installation
Instruments And Lights Installation
Valve Bank Assembly
Valve Assembly – Selector
Cab Installation (With Doors)
Cab Weldment (With Doors)
Door Assembly – Cab
Heater Installation – Gmc
Heater Assembly -Hot Water
Axle Installation – Rear
Axle Assy Clark Front
Axle Assy. Housing & Hub Group
Axle Assy. Diff. Carrier Group
Axle Assy. Park Brake Group
Axle Assy. Spider Assy. Group
Axle Assy. Brake Assy. Group
Cylinder Assembly – 3″ Steer(Complete Assembly )
Outrigger Installation
Cylinder Assembly -7″ Outrigger Jack
Transmission Installation
Transmission Assembly
Transmission Assembly front Cover And Case
Transmission Assembly clutch And Gear Parts – Main
Transmission Assembly disconnect Assembly
Transmission Assembly low Clutch Assembly
Transmission Assembly forward Clutch Assembly
Transmission Assembly third Clutch Assembly
Transmission Assembly reverse And Second Clutch
Transmission Assembly control Valve Assembly
Bottom Cable Entry Kit
Engine Installation -Gmc 4-53n
Filter Assembly – Oil
Pump Assembly -(W/O Return To Center Steering )
Hood Installation – Engine
Reservoir Installation -Hydraulic
Driveline Installation
Driveline Assembly
Tank Installation – Fuel
Tire And Wheel Assembly
Transmission/Converter Lines Installation
Power Boost And Brake lines Installation
Cylinder Assembly -Master With Power Head
Power Brake Assembly
Cylinder Assembly – Master
Valve Assembly -Flow Control
Axle Oscillation Lockout Installation
Cylinder Assembly -Lockout
Electrical Systems Installation – Carrier
Tool Box Step And Handle Installation – W/O Fenders
Cover Installation – Front
Battery Installation
Lights Installation -Front And Rear
Hydraulic Lines Installation -Supply, Pressure And Return
Hydraulic Lines Installation -Outrigger
Hydraulic Lines Installation -Front Steer
Hydraulic Lines Installation -Rear Steer
Hydraulic Lines Installation -Axle Lockout
Decal Installation -Rt58b,Rt58c,Rt58d













