Expert Support
Full Speed
100% Working
Grove Crane RT58C 49638 Parts Manual 2022
40 USD
- Description
Description
Contents:
Boom Assembly – 3 Section25′-60′
Cylinder Assembly – 6.50”Telescope
Sheave Assembly – Complete
Protection Bar Installation – Jib
Elevation Indicator Installation – Boom
Indicator Assembly -Lh Boom Elevation
Boom Extension Installation – 20′
Carrier Installation -Jib Boom
Ball Assembly – 150# Headache
Cable Reel Installation -Anti-Two Block
Panel Assembly – Indicator
Panel Assembly
Reel Assembly – Cable
Receptacle Assembly -6 Pin
Plug Assembly – 6 Pin
Turntable Drive Assembly & Installation
Swing Box Assy Complete-Mod Gb
Swing Box And Brake Assembly
Brake Assembly – Swing
Motor Assembly – Orbit
Counterweight Installation
Hoist Installation -Main And/Or Auxiliary
Hoist Assembly -Model Ho15b-11
Gear Reduction Assembly
Motor Assembly – Hydraulic
Cylinder Installation -Lift
Cylinder Assembly – Lift
Swivel Installation -Electric/Hydraulic
Swivel Coupling Assembly -Electric
Swivel Assembly – 7 Port Hydraulic
Control Valve And Linkage Installation
Valve Bank Assembly -2 Section (A-20 Series)
Valve Assembly – Section inlet (A-20 Series)
Valve Assembly -4 Section
Valve Assembly – Outlet
Valve Section – Inlet(A-35 Series)
Cartridge Assembly
Valve Assembly – Relief1000 Psi
Valve Bank Assembly -1 Section
Valve Assembly – Relief2250 Psi
Hydraulic Lines Installation -Swing
Valve Assembly – Relief
Hydraulic Lines Installation – Lift
Hydraulic Lines Installation -Mid-Telescope
Hydraulic Lines Installation -Main Hoist
Hose Clamps Installation – Main Hoist
Idler Drum Assembly
Console Installation -Front
Shift Installation -Axle And Range
Shift Installation -Transmission
Transmission Kit – Shift
Control Lever Assembly
Power Steering And Horn Installation
Valve Assembly – Steering control
Park Brake Installation
Instruments And Lights Installation
Valve Assembly – 4 Stack outrigger Solenoid
Valve Bank Assembly
Valve Assembly – Selector
Cab Installation (With Doors)
Cab Weldment (With Doors)
Door Assembly – Cab
Heater Installation – Gmc
Heater Assembly -Hot Water
Acoustical Installation
Fan Installation – Cab circulating
Fan Assembly – 12 Volt Cab(Complete Assembly )
Axle Installation – Front
Axle Assembly
Axle Assembly differential Carrier Assembly
Axle Assembly housing Assembly
Axle Assembly hub And Shaft Group
Axle Assembly Brake Assembly
Axle Assembly wheel Cylinder Assembly
Cylinder Assembly – Steer(Complete Assembly )
Axle Installation – Rear
Outrigger Installation
Cylinder Assembly -7″ Outrigger Jack
Transmission Installation
Transmission Assembly
Transmission Assembly front Cover And Case Assembly
Transmission Assembly clutch And Gear Group
Transmission Assembly axle Disconnect Assembly
Transmission Assembly low Clutch Assembly
Transmission Assembly forward Clutch Assembly
Transmission Assembly third Clutch Assembly
Transmission Assembly reverse And Second Shift
Transmission Assembly control Valve Assembly
Bottom Cable Entry Kit
Hood Installation – Engine
Driveline Installation
Driveline Assembly
Reservoir Installation -Hydraulic
Filter Assembly – Oil
Tank Installation – Fuel
Transmission/Converter Lines Installation
Power Boost And Brake lines Installation
Cylinder Assembly -Master With Power Head
Power Brake Assembly
Cylinder Assembly – Master
Valve Assembly -Flow Control
Axle Oscillation Lockout Installation
Cylinder Assembly -Lockout
Electrical Systems Installation – Carrier
Tool Box Step And Handle Installation – W/O Fenders
Cover Installation – Front
Battery Installation
Lights Installation -Front And Rear
Hydraulic Lines Installation -Outrigger
Hydraulic Lines Installation -Front Steer
Hydraulic Lines Installation -Rear Steer
Hydraulic Lines Installation -Axle Lockout
Engine Installation -Gmc 4-53n
Pump Assembly -(W/O Return To Center Steering )
Tire And Wheel Assembly (Left Hand)
Hydraulic Lines Installation -Supply, Pressure And Return













