Expert Support
Full Speed
100% Working
Grove Crane RT58C 71482 Parts Manual 2022
40 USD
- Description
Description
Contents:
Plug Assembly – 6 Pin
Boom Assembly – 3 Section25′-60′
Cylinder Assembly – 6.50”Telescope
Protection Bar Installation – Jib
Elevation Indicator Installation – Boom
Indicator Assembly -Lh Boom Elevation
Boom Extension Installation – 20′
Carrier Installation -Jib Boom
Sheave Installation
Sheave Installation -Boom Nose
Sheave Assembly – Complete
Panel And Cable Reel Installation
Panel Assembly – A2bcontrol
Harness Assy, Outrigger Cab To Board
Electric Reel Assembly -Anti 2 Block
Receptacle Assembly -6 Pin
Switch And Roller Guides Installation – Main Boom
Switch Assy,Anti-Two Block
Anti-Two Block Weight W/Chain
Guide Assembly – Roller
Anti-Two Block Installation – A-Frame Jib
Turntable Drive Installation
Wheel Assembly – Fifth
Box Assembly – Swing
Swing Box And Brake Assembly
Brake Assembly – Swing
Motor Assembly – Orbit
Turntable Installation
Counterweight Installation
Hoist Installation – Main
Hoist Assembly – Low Profile
Hoist Assembly
Valve Assembly – Motor control
Brake Assembly
Gear Reduction Assembly
Motor Assembly – Hydraulic vane Type
Cable Follower And Idler drum Installation
Cylinder Installation -Lift
Cylinder Assembly – Lift
Swivel Installation -Electric/Hydraulic
Ring Assembly – Slip
Swivel Assembly – 7 Port Hydraulic
Control Valve And linkage Installation
Valve Bank Assembly -2 Section (A-20 Series)
Valve Assembly – Section inlet (A-20 Series)
Valve Assembly -4 Section
Valve Assembly – Outlet
Valve Section – Inlet(A-35 Series)
Cartridge Assembly
Valve Assembly – Relief1000 Psi
Valve Bank Assembly -1 Section
Valve Assembly – Relief2250 Psi
Valve Assembly – Solenoid
Cylinder Assembly -Lockout
Valve Assembly -Flow Divider
Turntable Lock Installation
Hydraulic Lines Installation -Swing
Hydraulic Lines Installation – Lift
Hydraulic Lines Installation -Mid-Telescope
Hydraulic Lines Installation -Main Hoist
Hydraulic Lines Installation -Lever Lockout
Hose Clamps Installation – Main Hoist
Idler Drum Installation
Idler Drum Assembly
Pivot Shaft Installation -Boom
Console Installation -Front
Shift Installation -Axle And Range
Shift Installation -Transmission
Transmission Kit – Shift
Control Lever Assembly
Power Steering And Horn Installation
Valve Assembly – Steering control
Park Brake Installation
Seat And Seat Belt Installation
Seat Assembly – Industrial
Instruments And Lights Installation
Valve Assembly – 4 Stack outrigger Solenoid
Valve Bank Assembly
Valve Assembly – Selector
Extinguisher Installation – Fire
Cab Installation (With Doors)
Cab Weldment (With Doors)
Door Assembly – Cab
Heater Installation
Heater Assembly -Hot Water
Windshield Wiper Installation
Windshield Washer Installation
Mirror Installation – Rear
Circular Level Installation
Cover Installation -Seat Support
Fan Installation – Cab circulating
Fan Assembly – 12 Volt Cab(Complete Assembly )
Handrail Installation
Axle Installation – Front
Axle Assembly
Axle Assembly differential Carrier Parts
Axle Assembly housing Parts
Axle Assembly wheel End Parts
Axle Assembly Brake Parts
Axle Assembly wheel Cylinder Assembly
Cylinder Assembly – 3″Steer
Axle Installation – Rear
Cylinder Assembly -Lockout
Axle Assembly differential Carrier Assembly
Axle Assembly housing Assembly
Axle Assembly hub And Shaft Group
Axle Assembly Brake Assembly
Outrigger Installation
Cylinder Assembly -7″ Outrigger Jack
Transmission Installation
Transmission Assembly
Transmission Assembly case And Cover Group
Transmission Assembly idler Shaft And Front Cover
Transmission Assembly forward Shaft Group
Transmission Assembly reverse Idler Group
Transmission Assembly reverse And Second Shaft
Transmission Assembly low Speed Shaft Group
Transmission Assembly third Shaft Clutch Group
Transmission Assembly idler Shaft Group
Transmission Assembly output Shaft Group
Transmission Assembly hi And Low Range Shift
Transmission Assembly control Valve
Bottom Cable Entry Kit
Engine Installation -Cummins 6bt5.9
Muffler Installation
Cleaner Installation – Air
Cleaner Assembly – Air
Filter Assembly – Oil
Radiator Installation
Torque Converter Installation
Torque Converter Assembly
Pump Assembly -(W/O Return To Center Steering )
Harness Installation -Engine
Harness Assembly – Engine
Pump Installation -3 Stage
Pump Assembly – 3 Stage tandem
Hood Installation – Engine
Door Assembly – Right Hand
Door Assembly – Left Hand Side
Pump Cover Installation
Driveline Installation
Driveline Assembly
Reservoir Installation -Hydraulic
Tank Installation – Fuel
Tire And Wheel Assembly (Left Hand)
Hydraulic Lines Converter and Transmission
Power Boost And Brake lines Installation
Cylinder Assembly -Master With Power Head
Power Brake Assembly
Cylinder Assembly – Brake master
Valve Assembly -Flow Control
Valve Assembly – Relief
Valve Installation -Rear Axle Lock Nut
Valve Assembly – Lockout
Electrical System Installation – Carrier
Harness Assembly – Carrier
Tool Box Step And Handle Installation – W/Fenders
Cover Installation – Front
Battery Installation
Lights Installation -Front And Rear
Indicator Installation -Rear Steer
Switch Assembly – Limit
Fender Installation
Alarm Installation -Back-Up
Hydraulic Lines Installation -Supply, Pressure And Return
Hydraulic Lines Installation -Outrigger
Hydraulic Lines Installation -Front Steer
Hydraulic Lines Installation -Rear Steer
Hydraulic Lines Installation -Axle Lockout Without Override
Indicator Installation -Air Restriction
Valve Installation -Selector
Valve Assembly – Outrigger selector
Tire And Wheel Assembly (Right Hand)
Lug Nut And Washer Installation
Belt & Filter Cummins 6bt5.9













