Expert Support
Full Speed
100% Working
Grove Crane YB4415 CUM 320265 Parts Manual 2003
15 USD
- Description
Description
Contents:
Boom Group
Boom Assembly –
52’ Long
Cylinder Assembly –
5″ Telescope
Nose Installation – Auxiliary
Boom
Extension Installation –
Fixed Offset Boom
Socket, Open Wedge
(5/8’’ Rope)
Complete Assembly
Indicator Installation –
Boom Angle
Pointer Assembly
Ball Assembly – Overhaul
(125 Lbs)
Hookblock Assembly – 15 Ton
Boom Installation – Main
Extension Installation –
Offsetable Boom
A2b
Boom Kit Installation
Sensor Assembly
Kit Installation – Fixed
Single Axis Boom Extension
Boom Kit Installation
Clip Installation – Wire Rope
Cab Group
Electrical System Installation
Harness Assembly
System Installation –
Electric
Harness Assembly
Panel Installation –
Fuse And Relay
Panel Assembly –
Fuse And Relay
Harness Assembly – Fuse Panel
Cover Installation –
Enclosed Cab
Fan Assembly – 12 Volt Cab
Door Assembly
Handle Assembly – Paddle Lock
Window Assembly – Right Front
Harness Assembly
Cab Installation – Lower Area
Panel Assembly –
Instruments And Lights
Harness Assembly – Console
Heater Installation – Cummins
Heater Assembly – 12 Volt
Throttle Installation
Pedal Assembly –
Accelerator
Pedal Assembly –
Accelerator
Pedal Assembly –
Accelerator
Seat Installation
(Deluxe)
Seat Assembly – Deluxe
Light Installation – Flasher
Light Assembly – Strobe
Harness Assembly
Q00, Mini-Binder Instl
Control Valve Group
Hyd Comp Inst W/4 Wh & I & 3rd
Valve Assembly – Hoist Control
Valve Assembly – Control
(Lift/Tele/Swing)
Pressure Switch N.C.-Rework
Unit Assembly –
Steering Control
Cylinder Assembly – Master
Steer Selector Valve
4 Sect O/R Selector Valve
Valve Assembly – Solenoid
Valve Assembly – Three Way
Solenoid
Valve Assembly – Solenoid
(4 Wheel Drive)
Hydraulic Lines Installation –
Supply, Pressure And Return
Hydraulic Lines Installation –
Independent Outrigger
Steer Hyd Lines Instl-4 Wheel
Hydraulic Lines Installation –
Swing
Hydraulic Lines Installation –
Hoist
Hydraulic Lines Installation –
Telescope
Hydraulic Lines Installation –
Lift
2 Whl/4 Whl Hyd Lines Instl
Hoist Group
Hoist Installation
Hoist Assembly- Model Hp12
Complete Assembly
Turntable Group
Turntable Installation
Cylinder Installation – Lift
Cylinder Assembly – Lift
Cylinder Assembly – Lift
Shaft Installation –
Boom Pivot
Counterweight Installation
Limiter Installation –
Rated Capacity
Swivel Installation –
Electric And Hydraulic
Elec & Hyd Swivel Assy
Swivel Assy-7 Port Hyd
Slip Ring Assembly – 10
Conductor
Engine Group
Engine Installation
Engine Assembly
Transmission Assembly
Complete Assembly
Transmission Assembly
Converter Housing Group
Transmission Assembly
Transmission Case And
Plate Group
Transmission Assembly
Torque Converter Group
Transmission Assembly
Gear Group
Transmission Assembly
Pump Drive Group
Transmission Assembly
Charging Pump Group
Transmission Assembly
Reverse Idler Group
Transmission Assembly
Forward And Reverse
Shaft Group
Transmission Assembly
Third Shaft Group
Transmission Assembly
First And Second Shaft Group
Transmission Assembly
Outer Shaft Group
Transmission Assembly
Disc Brake Group
Transmission Assembly
Caliper Assembly Group
Transmission Assembly
Electric Control Group
Transmission Assembly
Drive Plate Group
Pump Assembly – P350
Actuator Assembly –
Hydraulic Spring Brake
Electric System Installation –
Engine,Diesel
Harness Assembly – Diesel
Receptacle Assembly
Battery Installation
Heater Installation – Block
Start Installation – Ether
(Cummins)
Radiator Installation
Radiator Assembly
Radiator And Oil Cooler
Assembly
Muffler And Air Cleaner
Installation
Air Cleaner Assembly
Hood Installation – Engine
Drive Train Group
Driveline Installation –
4 X 4
Slip Assembly – Driveline
Slip Assembly – Driveline
Axle Group
Tire And Wheel Installation
Tire And Wheel Assembly
Axle Installation – Front
Drive/Steer
Axle Assembly – Front
Drive/Steer
Axle Assembly – Drive/Steer
Axle Assembly – Drive/Steer
Drive Steer Assembly
Axle Assembly – Drive/Steer
Axle Assembly – Drive/Steer
Hub And Components, Steer Axle
Axle Assembly – Drive/Steer
Differential Assembly
Axle Assembly – Drive/Steer
Crown Wheel And Pinion
Axle Assembly – Drive/Steer
Brake Parts, Steering Axle
Cylinder Assembly – 2 1/2″ Steer
Complete Assembly
Switch Assembly
Axle Installation
Axle Assembly – Rear Drive
Steer
Axle Assembly – Drive/Steer
Axle Assembly – Drive/Steer
Drive Steer Assembly
Axle Assembly – Drive/Steer
Axle Assembly – Drive/Steer
Hub And Components, Steer Axle
Axle Assembly – Drive/Steer
Differential Assembly
Axle Assembly – Drive/Steer
Crown Wheel And Pinion
Axle Assembly – Drive/Steer
Brake Parts, Steering Axle
Cylinder Assembly – 2 1/2″ Steer
Complete Assembly
Hydraulic Lines Installation –
Service Brakes
Outrigger Group
Outrigger Installation
Cylinder Assembly – 3″ O/R Extension
Complete Assembly
Frame Group
Frame Ass’y (W/Rotek Bearing)
Frame Section
Weld Stud Installation
Not Available As Assembly
Drive Assembly – Swing
Gear Assembly – Worm
Speed Reducer
Motor Assembly – Orbit
Decal Instl Yb4415-Std
Decal Instl Yb4415-Std-Car&S/S
Decal Instl Yb4415-Std-Boom
Decal Installation
Cover Installation – Deck
Mirror Installation
Mirror Head And Loop
Assembly – Stainless Steel
Hookblock Tie-Down
Installation
Decal Installation
Hardware Kit
Tanks
Installation –
Diesel
Filter Assembly – Return
Hydraulic Lines Installation –
Pressure Check
Lights Installation – Exterior
Box Installation –
Tool And Battery
Counter Weight Instl
Pinion And Bearing Guard Instl
Schematic
Hydraulic Sys Schem
Electrical Schematic –
Diesel













