Expert Support
Full Speed
100% Working
Grove Crane YB5520 322206 Parts Manual 2014
30 USD
- Description
Description
Contents:
Boom
Mast Installation
55ft Boom Group – Yb5520
Cylinder Assembly – Extension
Yb5520
Holding Valve Assembly
Load Moment Indicator Install I4500 Us
(Dual Cylinder)
Guide Assembly – Roller
(Complete Assembly)
Harness W/ Resistor Assy
Load Moment Indicator Kit – I4500 Us
(Dual Cylinder)
Display Controller Assy.
Canbus Cable Reel Med Assy.
15-25′ Jib Installation Yb5520
15-25ft Jib Group – Yb5520
Jib Anti Two Block Group – Yb5520
Anti Two Block Switch Assembly –
Tele-Jib (N.O.)
80030003 Boom Yb5520/Cd5520b
Boom Work Lights Installation
Boom Light – Rework
Harness Install 5520 – Mast
Harness – Boom Yb5515
Lift Cylinder & Pins Install
Lift Cylinder Assembly
Yb5520
Kit, Seal Head Assy.
Pin Installation – Boom Pivot
Hookblock Tie-Down Installation
(All Industrial Cranes)
Superstructure
Hoist Installation
Hoist Assembly – 2 Speed Gear
Hydraulic Swivel Installation – 7 Pass
Swivel – Hydraulic, 7-Port, O-Ring Ports
Electric Swivel Installation – 13 Pass
Swivel Assembly – Hydraulic
(13 Circuit)
(Complete Assembly)
Superstructure Plumbing
Counterweight Installatipm
Superstructure Cab
Cab Assembly & Installation
Control Assembly –
Electronic Throttle
Valve – Brake Modulating
Dash Assembly
Wiring Harness – Dash
Flasher – Electronic Rework
Single Axis Joystick Assembly
Steering Wheel Assembly With Shifter
Seat Assembly – Adjustable Suspension
(Complete Assembly)
Defroster Switch Installation
Heater Switch Installation
Cover Installation
Lowerworks/Carrier
Frame Assembly – T4
Fuel/Reservoir Tank Install
Diesel Fuel Tank (40 Gallon)
Reservoir Assembly – Hydraulic
Outriggers Installation
Cylinder, Hydraulic
Cylinder Assembly – Jack
Yb5518
(Complete Assembly)
Lower Hydraulic Buildup – T4
Main Outrigger Valve Manifold
(5-Section)
Valve Assembly – Outrigger Control
5 Section
(Complete Assembly)
Valve,Control,4 Section
Steering And Brakes Manifold
Valve Assembly
Steering Mode
(Complete Assembly)
Transmission Oil Cooler Control Valve
Dump Valve Assembly
Manifold,Selectable Psi Red’g
Engine Installation –
Tier 4, 2wheel Drive
Engine Assembly T4 – 2wd
Transmission Group – 2 Wheel Drive
(For Reference Only)
Transmission Assembly – Complete
(2 Wheel Drive)
Drive Transmission – External Component
Drive Transmission – Pump Drive Shaft
Drive Transmission – Main Shaft &
Components
Drive Transmission – Layshaft &
Components
Drive Transmission – Input Clutch
Drive Transmission – Reverse Clutch
Drive Transmission – Output Flange
Drive Transmission-Piping(2wheel Drive)
Drive Transmission – Solenoid Valves
(2wheel Drive)
Pump Assembly – Piston
60cc Counter Clockwise Rotation
Harness, Transmission
Electrical System Installation –
Engine Tier 4
Harness Assembly – T4 Engine
Element,Filter Fuel/Water Sep
Crankcase Breather Assy. Group
Block Heater Installation – Qsb3.3 120v
Exhaust Install T4 – Ind20ton
Axle Installation – Front
Brake Assembly – Parking
(Complete Assembly)
Drive Line Assembly
(Complete Assembly)
Axle Drive Assembly – Pad Mounted
(Complete Assembly)
Drive Head Group
Wheel Hubs Group
Hub Swivels And Track Rod Group
Switch Assembly – Proximity
(Normally Open)
(Rework)
Fire Extinguisher Instl-2.5lb
Axle Installation – Rear (2wd)
Axle Assembly – Non Drive
Rear Steer
(Complete Assembly)
Axle Housing Group – Non Drive
Rear Steer
(Used On 2-Wheel Drive Units Only)
Planetary Hub Group
(2-Wheel Drive Units)
Hub And Track Group
(2-Wheel Drive Units)
Brake Group – Wheel Brakes
(2-Wheel Drive Units)
Cylinder Group – Steer
(2-Wheel Drive Units)
Cylinder Assembly – Steering
(Complete Assembly)
Switch Assembly – Proximity
(Normally Open)
(Rework)
Tire/Rim Assembly Installation
Tire And Rim Assembly
Ind20ton Convience Package
Hitch Group – Front Pintle
Hook Assembly – Pintle
Battery Installation – Yb5520
Relay Panel Assembly
Harness – Relay Panel 5520
Radiator Installation – Ind 5515/5520 T4
Radiator Assembly – Ind5515/5520 T4
Radiator And Cac Cooler
Fan Shroud Assembly
Surge Tank Assembly
Air Intake Install T4 – Ind20
Air Cleaner
Electrical System Installation –
Carrier Harness
Wiring Harness-Carrier 5520/15
Fan Guard Installation W/O A/C
Swing Gear Installation
Gearcase, Swing – T Model
Motor Assembly – Hydraulic Swing
(Complete Assembly)
Proximity Switch Installation –
Outrigger Monitoring System
Ind 5520
Proximity Switch Assembly – 30mm
Engine Hood Install – T4
Engine Hood Assembly
Light Installation
Alarm Installation
Cooler Install – Transmission
Oil Cooler – Transmission
Carrier/Frame Cab
Cab Shell Installation
Yb5520/15 Cab Harness Install
Yb5520/15 Cab Harness
Cab – Enclosed
Windshield Wiper Assembly
Door Installation – (Split)
Cab Split Door Assembly With Cup Holder
Window Assembly – Half Door
Light Installation – Strobe
Heat Or/Defroster Install – T4
Heater Assembly
(Complete Assembly)
Load Chart Binder Installation –
Yard Boss
Swing Lock Switch Installation – 10.5ton
Cab Hydraulic Buildup
Door Strap Installation
Windshield Washer Installation
Lmi Override Switch Install
Hoist Speed Switch Install
Split Door Stop Installation
Loose Ship Items
Downhaul Weight Assembly – 105lbs
Ind 9/16 Wire Rope
20t Hookblock-9/16rope,350#4pt
Socket Installation
Socket Assembly – 5/8″ Wedge
80030011s Ship Yb5520/Cd5520
Specs/Schematics
Elec Schematic 5520 T3 & T4
Hydraulic Schematic
5520 Pressure Settings
80030004 Spec Yb5520/Cd5520b
Electrical Group
Decals
Miscellaneous Decals
Decal Installation -20ton
Decal Installation – Cab-20ton
Decal Installation –
Carrier/Superstructure – 20ton
Decal Installation – Yb5520
Nomenclature
Cca-Yb5520