Expert Support
Full Speed
100% Working
Hangcha A Series CJD05-AC1-MNA to CJD05-AC2-MNAI Operation Maintenance Manual 2025 ZH EN
20 USD
- Description
Description
Contents:
I Overview
1.1 Application Environments
1.2 Intended Use And Scope Of Application
1.3 Obligations And Responsibilities Of The User
1.4 Installation Of Attachments And/Or Modification Of
1.5 Equipment Traveling Direction And Wheel Trajectory
1.6 Product Model Description
1.7 Names Of Main Components And Overview Of System Fu
1.8 Equipment Labels
1.9 Technical Performance Parameters Table
1.10 Force-Bearing Structural Components
Ii Stability
Iii 安全信æ¯
3.1 培è®åŠäººå‘˜è¦æ±‚
3.2 工作场所ã€å±é™©åŒºåŸŸã€çŽ¯å¢ƒã€è·¯é¢ã€è¡Œé©¶é“è·¯
3.3 å®‰å…¨æ ‡å¿—ï¼ˆå«è½½è·ä¸å¿ƒæ›²çº¿ï¼‰
3.4 载货架上载è·åŠå…¶å †æ”¾
3.5 è¿è¡Œä¸Žæ“ä½œã€æ£€æŸ¥ã€ç»´æŠ¤ç»´ä¿®
3.6 其它
Iv Control Parts And Dashboards
4.1 Control Parts
4.2 Dashboard (Cjd05-Ac1-Mnaã€Cjd05-Ac1-Mnai)
4.3 Dashboard (Cjd05-Ac1-Mnaã€Cjd05-Ac1-Mnai)
4.4 Body And Other Parts
V Operation
5.1 Getting On And Off The Equipment
5.2 Starting
5.3 Driving
5.4 Braking
5.5 Emergency Stop
5.6 Steering
5.7 Cargo Picking
5.8 Cargo Transportation
5.9 Cargo Arrangement
5.10 Park The Equipment According To Rules
Vi Battery
6.1 Lithium-Ion Battery
6.2 Lead-Acid Battery
6.3 Battery Replacement
6.4 Battery Installation
Vii Equipment Transportation
7.1 Lifting
7.2 Fixing During Transportation
7.3 Transportation
Viii First-Time Use
Ix Equipment Cleaning
X Disposal Of Scrap Equipments
Xi Inspection And Maintenance
11.1 Maintenance Regulations
11.2 Regular Replacement Of Key Safety Parts
11.3 Oil Diagram
11.4 Daily Maintenance (8 Hours)
11.5 Weekly Maintenance (40 Hours)
11.6 Monthly Maintenance (200 Hours)
11.7 Annual Maintenance (2,000 Hours)
11.8 Maintenance Schedule
Xii Parking And Storage Of The Equipment
12.1 Long-Term Storage
12.2 Equipment Operation After Long-Term Storage











