- NEWS UPDATE 06.2026 - [HOT] How To Discount - How To Pay By Visa Through Paypal - [HOT] Remote Service Support Program - How to Payment and Delivery - Exchange Manual & Software -

Haulotte Articulating Booms SIGMA 16 to SIGMA 46 PRO Operators Manual 4001311000 02.2026 EN

Expert Support

Full Speed

100% Working

Haulotte Articulating Booms SIGMA 16 to SIGMA 46 PRO Operators Manual 4001311000 02.2026 EN

Size: 16.46 MB
Format: PDF
Language: English
Brand: Haulotte
Type of Machine: Articulating Booms
Type of Manual: Operators Manual
Model: Haulotte SIGMA 16, SIGMA 46, SIGMA 16 PRO, SIGMA 46 PRO Touch Screen Display Articulating Booms
Part Number: 4001311000
Publication Date: 02.2026
Number of Pages: 190 Pages

20 USD

  • Description

Description

Contents:
1 Foreword
2 Responsibilities
2.1 Owner’s responsibility
2.2 Employer’s responsibility
2.3 Trainer’s responsibility
2.4 Operator’s responsibility
3 Safety
3.1 Safety instructions
3.1.1 Incorrect use
3.1.2 Falling Hazards
3.1.3 Overturning / Tip-over Hazards
3.1.4 Risk of electric shock (electrocution)
3.1.5 Explosion / Fire Hazards
3.1.6 Crushing / Collision Hazards
3.1.7 Risk of involuntary movements
4 Safety inquiries
5 Incident notification
6 Compliance
6.1 Product modification
6.1.1 Implementing manufacturer safety campaigns
6.2 Product specifications
6.3 Change of Ownership Notification
6.4 Declaration of conformity
6.4.1 Declaration of conformity  -  All machines
6.4.2 Declaration of conformity  -  Electric platforms
Familiarization
1 General safety
1.1 Intended use
1.2 Decal content
1.3 Level of severity
1.4 Symbols legend and definitions
1.5 Symbols and colors
2 Models description
3 Primary machine components
3.1 Layout
3.2 Ground control box  -  Service / Emergency station
3.2.1 Layout-Touch screen display
3.2.2 Touch screen display
3.3 Platform control box  -  Main station
3.3.1 Layout
3.3.2 Battery charging indicator(90)
3.3.3 Display Panel (LED’S 101 – 116)
4 Performance Specifications
4.1 Technical characteristics
4.2 Working area / Range of motion
5 Decals and markings locationsPre-operation inspection
1 Recommendations
2 Working area assessment
3 Inspection and Functional test
3.1 Daily inspection
4 Safety functional checks
4.1 Emergency Stop button check
4.2 Activation of controls
4.3 Fault detector
4.3.1 Indicators/LED’s test
4.3.2 Buzzers test
4.4 Overload sensing system
4.5 Slope warning device
4.6 Travel speed limitation
4.7 On-board electronics
4.8 Braking test
4.9 Overload test
Operation instructions
1 Operation
1.1 Introduction
1.2 Major description
1.3 Operation from the ground control box (Service / Emergency station)
1.4 Operation from the platform control box (Main station)
2 Ground control box  -  Service / Emergency station
2.1 To start and stop the machine
2.2 Movement control
2.3 Additional controls
3 Platform control box  -  Main station
3.1 To start and stop the machine
3.1.1 To start the machine
3.1.2 To stop the machine
3.2 Drive and steer control
3.3 Movement control
3.4 Additional controls
3.4.1 Activ’ Lighting System
3.4.2 Drive Orientation Assist system (If equipped)
4 Rescue and emergency procedures
4.1 Main power supply failure
4.1.1 Procedure
4.2 To rescue operator in platform
4.3 Operation of overriding system from ground control box
5 Transportation
5.1 Transport configuration
5.2 Machine stowage for transport  -SIGMA 16 – SIGMA 46 – SIGMA 16 PRO – SIGMA 46 PRO
5.3 Unloading
5.4 Towing
5.4.1 Electric brake release
5.5 Storage
5.6 Lifting operation
6 Cold Weather Recommendations
6.1 Hydraulic oil
7 Battery care and maintenance
7.1 Battery recharge
7.1.1 On-board charger
7.1.2 Battery charging
7.2 Battery care and maintenance
7.2.1 Filling batteries
7.2.1.1 Procedure to fill the batteries manually-Option
7.2.1.2 Procedure to fill the batteries automatically-Option
7.2.2 Desulfation charge
7.3 Optimise battery life
General Specifications
1 Machine dimensions
2 Major component masses
3 Acoustics and vibrations
4 Wheel/Tire assembly
4.1 Technical specifications
4.2 Inspection and maintenance
Maintenance
1 General
2 Maintenance Schedule
3 Inspection program
3.1 General program
3.2 Daily inspection
3.3 Periodic inspection
3.4 Reinforced inspection
3.5 Major inspection
4 Repairs and adjustments
Options
1 Compatibility
2 Advanced Access Management  -  Access control and usage restriction
2.1 Description
2.1.1 Access control
2.1.2 Usage restriction
2.1.3 GEOFENCE
2.1.4 TIMEFENCE
2.1.5 Remote restriction
2.2 Additional functions
2.2.1 Access control and usage restriction combination
2.2.2  tracker default function
2.3  SUPER USER status
2.4 Code for removing restrictions
2.5 Operation
2.5.1 Using a machine with access control enabled
2.5.2 Starting a machine with usage restriction enabled
3 Platform
4 Swing gate
4.1 Description
4.2 Specifications
4.3 Safety precautions
4.4 Pre-operation instructions
4.5 Specific decals, optional
5 Plumber’s kit
5.1 Description
5.2 Characteristics
5.3 Safety precautions
5.4 Pre-operation inspection
5.5 Operation
5.6 Assembly-Dis-assembly
5.7 Specific decals, optional
6 Signalling cones holder
6.1 Description
6.2 Characteristics
6.3 Safety precautions
6.4 Pre-operation inspection
6.5 Operation
6.6 Assembly-Dis-assembly
7 Neon tube holder
7.1 Description
7.2 Characteristics
7.3 Safety precautions
7.4 Pre-operation inspection
7.5 Operation
7.6 Assembly-Dis-assembly
8 Activ’ Shield Bar  -  Secondary crush risk reduction system (If fitted)
8.1 Description
8.2 Characteristics
8.3 Safety precautions
8.4 Pre-operation inspection
8.5 Operation
8.6 Specific decals
Other information
1 Conditions of warranty
2 Subsidiary contact information
2.1 California warning
Records
1 Intervention register