- NEWS UPDATE 06.2026 - [HOT] How To Discount - How To Pay By Visa Through Paypal - [HOT] Remote Service Support Program - How to Payment and Delivery - Exchange Manual & Software -

Haulotte Telescopic Booms HT43 RTJ PRO HT132 RTJ PRO Operators Manual 4001324130 09.2025 EN

Expert Support

Full Speed

100% Working

Haulotte Telescopic Booms HT43 RTJ PRO HT132 RTJ PRO Operators Manual 4001324130 09.2025 EN

Size: 10.66 MB
Format: PDF
Language: English
Brand: Haulotte
Type of Machine: Telescopic Booms
Type of Manual: Operators Manual
Model: Haulotte HT43 RTJ PRO, HT132 RTJ PRO Telescopic Booms
Part Number: 4001324130
Publication Date: 09.2025
Number of Pages: 150 Pages

20 USD

  • Description

Description

Contents:
Foreword
1 Foreword
2 Responsibilities
2.1 Owner’s responsibility
2.2 Employer’s responsibility
2.3 Trainer’s responsibility
2.4 Operator’s responsibility
3 Safety
3.1 Safety instructions
3.1.1 Incorrect use
3.1.2 Falling Hazards
3.1.3 Overturning / Tip-over Hazards
3.1.4 Risk of electric shock (electrocution)
3.1.5 Explosion / Fire Hazards
3.1.6 Crushing / Collision Hazards
3.1.7 Risk of involuntary movements
4 Safety inquiries
5 Incident notification
6 Compliance
6.1 Product modification
6.1.1 Implementing manufacturer safety campaigns
6.2 Product specifications
6.3 Change of Ownership Notification
6.4 Declaration of conformity
6.4.1 Declaration of conformity  -  All machines
6.4.2 Declaration of conformity  -  Thermal platforms
Familiarization
1 General safety
1.1 Intended use
1.2 Decal content
1.3 Level of severity
1.4 Symbols legend and definitions
1.5 Symbols and colors
2 Models description
3 Primary machine components
3.1 Layout
3.2 Ground control box  -  Service/Emergency station
3.2.1 Layout
3.2.2 Display Panel (LED’S 1 – 10)
3.3 Platform control box  -  Main station
3.3.1 Layout
3.3.2 Display Panel (LED’S 101 – 117)
3.4 DPF (Diesel Particle Filter) (If equipped - Deutz 2,2 TDC engine only)
3.4.1 Automatic regeneration
3.4.2 Manual regeneration
3.4.3 To stop manual regeneration
3.5 Axle extension control box
3.5.1 Layout
4 Performance Specifications
4.1 Technical characteristics
4.2 Engine specifications
4.2.1  Deutz engines
4.2.2  Perkins engines
4.3 Working area / Range of motion
5 Decals and markings locations
Pre-operation inspection
1 Recommendations
2 Working area assessment
3 Inspection and Functional test
3.1 Daily inspection
4 Safety functional checks
4.1 Emergency Stop button check
4.2 Activation of controls
4.3 Fault detector
4.3.1 Indicators/LED’s test
4.3.2 Buzzers test
4.4 Automatic engine cut-out
4.5 Overload sensing system
4.6 Oscillating axles
4.7 Slope warning device
4.8 Travel speed limitation
4.9 Movement speed
4.10 On-board electronics
4.11 Radius limitation
4.12 Axle extension
4.13 Braking test
4.14 Overload test
Operation instructions
1 Operation
1.1 Introduction
1.2 Major description
1.3 Operation from the ground control box (Service/Emergency station)
1.4 Operation from the platform control box (Main station)
2 Ground control box  -  Service/Emergency station
2.1 To start and stop the machine
2.2 Movement control
2.3 Additional controls from the ground control box
3 Platform control box  -  Main station
3.1 To start and stop the machine
3.2 Drive and steer control
3.3 Movement control
3.4 Additional controls
4 Axle extension control box
4.1 Prepare the machine
4.2 Axle extension operation
4.2.1 For rear axle extension
4.2.2 For front axle extension
4.3 Axle retraction operation
4.3.1 For front axle retraction
4.3.2 For rear axle retraction
5 Radius limitation
5.1 Procedure
5.1.1 Front stability
5.1.2 Rear stability
6 Rescue and emergency procedures
6.1 In case of power loss
6.2 To rescue operator in platform
6.3 Operation of overriding system from ground control box
6.4 No power available
7 Transportation
7.1 Transport configuration
7.2 Machine stowage for transport  – HT43RTJ PRO – HT132RTJ PRO
7.3 Unloading
7.4 Towing
7.4.1 Disengaging the drive hubs
7.4.2 Re-engaging the drive hubs
7.5 Storage
7.6 Lifting operation
7.6.1 Necessary equipment
7.6.2 Preliminary procedures
7.6.3 Procedure for the use of slings
8 Cold Weather Recommendations
8.1 Engine oil
8.2 Hydraulic oil
8.3 Preheating operation
General Specifications
1 Machine dimensions
2 Major component masses
3 Acoustics and vibrations
4 Wheel/Tire assembly
4.1 Technical specifications
4.2 Inspection and maintenance
5 Options
5.1 Compatibility
5.2 Platform
5.2.1 Swing gate
5.2.1.1 Description
5.2.1.2 Specifications
5.2.1.3 Safety precautions
5.2.1.4 Pre-operation instructions
5.3 On-board generator
5.3.1 Description
5.3.2 Characteristics
5.3.3 Safety precautions
5.3.4 Pre-operation inspection
5.3.5 Operation
5.4 Welder’s kit
5.4.1 Description
5.4.2 Characteristics
5.4.3 Safety precautions
5.4.4 Pre-operation inspection
5.4.5 Operation
5.4.6 Assembly-Dis-assembly
5.4.7 Specific decals
5.5 Plumber’s kit
5.5.1 Description
5.5.2 Characteristics
5.5.3 Safety precautions
5.5.4 Pre-operation inspection
5.5.5 Operation
5.5.6 Assembly-Dis-assembly
5.5.7 Specific decals, optional
5.6 Activ’ Shield Bar  -  Secondary crush risk reduction system (If fitted)
5.6.1 Description
5.6.2 Characteristics
5.6.3 Safety precautions
5.6.4 Pre-operation inspection
5.6.5 Operation
5.6.6 Specific decals
Maintenance
1 General
2 Maintenance Schedule
3 Inspection program
3.1 General program
3.2 Daily inspection
3.3 Periodic inspection
3.4 Reinforced inspection
3.5 Major inspection
4 Repairs and adjustments
Other information
1 Conditions of warranty
2 Subsidiary contact information
2.1 California warning
Records
1 Intervention register