Expert Support
Full Speed
100% Working
Kobelco Excavator SK135SR-7 SK140SRLC-7 SK140SRL-7 Operation Manual S2YY00041ZE03
20 USD
- Description
Description
Contents:
1. SAFETY INSTRUCTIONS
1.1 SAFETY LABELS & DECALS
1.2 PRE-START SAFETY
1.3 SECURE VISIBILITY
1.4 PRECAUTIONS FOR OPERATION
1.5 AT THE END OF EACH SHIFT
1.6 PRECAUTIONS OF INSPECTION & MAINTENANCE
1.7 PRECAUTIONS FOR BATTERY
1.8 HANDLING OF THE ACCUMULATOR OR GAS SPRING
2. MACHINE FAMILIARIZATION
2.1 BASIC COMPONENTS OF THE MACHINE
2.2 OPERATOR’S STATION NOMENCLATURE
2.3 MONITOR
2.4 HANDLING OF SWITCHES AND METERS
2.5 HANDLING OF LEVERS AND PEDALS
2.6 HANDLING OF FUSE & RELAY BOX
2.7 HANDLING OF FUSIBLE LINK FOR STARTER
2.8 CONTROLLER
2.9 HANDLING OF RADIO
2.10 AIR CONDITIONER
2.11 HANDLING OF SEAT BELT
2.12 HANDLING OF OPERATOR’S SEAT AIR SUSPENSION SEAT
2.13 HANDLING PARTS INSIDE CAB
2.14 EMERGENCY ESCAPE FROM OPERATOR’S STATION
2.15 OTHER ACCESSORIES
2.16 BATTERY POWER-OFF SWITCH
3. MACHINE OPERATION
3.1 DAILY MAINTENANCE CHECKS
3.2 CHECK BEFORE STARTING ENGINE
3.3 STARTING ENGINE
3.4 STOPPING MACHINE ENGINE
3.5 CHECK AFTER STARTING ENGINE
3.6 WARMING-UP
3.7 AUTO IDLING STOP FUNCTION
3.8 WORK MODE SELECTION
3.9 SWITCHING ATTACHMENT MODE
3.10 MACHINE OPERATION
3.11 WORK PROCEDURES OF MACHINE
3.12 ALWAYS PARK MACHINE PROPERLY
3.13 INSPECTION AND CHECK AFTER OPERATION
3.14 MACHINE OPERATION IN ADVERSE CONDITIONS
3.15 PRECAUTIONS FOR LONG-TERM STORAGE
4. INSPECTION AND MAINTENANCE
4.1 GENERAL
4.2 INSPECTING AND MAINTAING MACHINE
4.3 EXHAUST GAS CLEANING DEVICE DOC
4.4 SCR SYSTEM AND DEF/ADBLUE
4.5 LUBRICANT, FUEL & COOLANT SPECIFICATIONS
4.6 ABOUT USE OF BIO-OIL BIODEGRADABLE HYDRAULIC OIL
4.7 MAINTENANCE PARTS
4.8 TIGHTENING TORQUES FOR BOLTS & NUTS SPECIFIC POSITIONS
4.9 TIGHTENING TORQUES FOR BOLTS & NUTS
4.10 TIGHTENING TORQUES FOR JOINTS & HYDRAULIC HOSES
4.11 INSPECTION AND MAINTENANCE CHART
4.12 MAINTENANCE WHEN REQUIRED
4.13 8 HOUR DAILY INSPECTION & MAINTENANCE PROCEDURES
4.14 50 HOUR INSPECTION & MAINTENANCE PROCEDURES
4.15 120 HOUR INSPECTION & MAINTENANCE PROCEDURES
4.16 250 HOUR 3-MONTH INSPECTION & MAINTENANCE PROCEDURES
4.17 500 HOUR 6-MONTH INSPECTION & MAINTENANCE PROCEDURES
4.18 1000 HOUR 12-MONTH INSPECTION & MAINTENANCE PROCEDURES
4.19 2000 HOUR INSPECTION & MAINTENANCE PROCEDURES
4.20 5000 HOUR INSPECTION & MAINTENANCE PROCEDURES
5. TRANSPORTATION
5.1 TRANSPORTATION
5.2 LOADING/UNLOADING THE MACHINE
5.3 MACHINE LIFTING
5.4 INSTALLING AND REMOVING MIRROR
5.5 TOWING THE MACHINE
6. SPECIFICATION
6.1 GENERAL SPECIFICATIONS
6.2 SHOE TYPES AND USES
6.3 WORKING RANGES
6.4 ATTACHMENT TYPE AND COMBINATION
7. MACHINE OPERATION MANAGEMENT SYSTEM
7.1 MACHINE OPERATION MANAGEMENT SYSTEM
7.2 REMOTE DOWNLOAD SYSTEM
8. OPTIONAL EQUIPMENT
8.1 OPERATION OF HYDRAULIC NIBBLER CRUSHER AND BREAKER
8.2 SELECTION OF ATTACHMENT MODE AND SELECTOR VALVE
8.3 SWITCHING STOP VALVE
8.4 FLOW RATE ADJUSTMENT
8.5 CONTROL OF PROPORTIONAL HAND CONTROL
8.6 PERIODIC INSPECTION AND MAINTENANCE OF NIBBLER CRUSHER AND BREAKER
8.7 PRECAUTIONS FROM BREAKER MANUFACTURERS
8.8 MULTI-CONTROL VALVE
8.9 QUICK HITCH
8.10 HANDLING OF OPERATOR’S SEAT MECHANICAL SUSPENSION SEAT
8.11 FLOATING DOZER
9. SPECIAL PROCEDURES
9.1 SPECIAL PROCEDURES AT ENGINE FAILURE
9.2 LOWERING ATTACHMENT TO GROUND
9.3 RELEASING TRAVEL MOTOR BRAKES
9.4 RELEASING SWING BRAKES











