- NEWS UPDATE 01.2026 - [HOT] How To Discount - How To Pay By Visa Through Paypal - [HOT] Remote Service Support Program - How to Payment and Delivery - Exchange Manual & Software -

Komatsu Mining Shovel PC8000 General Assembly Procedure FAMPC8000-06

-50%

Expert Support

Full Speed

100% Working

Komatsu Mining Shovel PC8000 General Assembly Procedure FAMPC8000-06

Size: 5.2 MB
Format: PDF
Language: English
Brand: Komatsu
Type of Machine: Mining Shovel
Type of Manual: General Assembly Procedure
Model: Komatsu PC8000 Mining Shovel
Form Number: FAMPC8000-06
Number of Pages: 158 Pages

Original price was: 20.Current price is: 10. USD

Tag:
  • Description

Description

Contents:
1. Mounting Of Crawler Segments To The Side Frames: Z22917
2. Assembly Of Undercarriage: Z22918
3. Assembly Of Cable Reel Unit: Z22919
4. Mounting Of Final Drives: Z22921
5. Electric Drive Only: Mounting Of Auxiliary Weight At The Undercarriage: Z22993
6. Mounting Of Slew Ring Underneath The Superstructure Platform: Z22922
7. Assembly Of The Superstructure Platform Onto The Undercarriage: Z22923
7.1 Rotary Distributor Z22924
8. Assembly Of The Prime Drive Unit To The Superstructure Platform: Z22925 I Z22926
8.1 Overview Drive Unit
8.2 Electric Drive: Direction Of Motor Rotation; Mounting The Coupling
9. Preassembly Boom- And Stick Cylinders To The Boom: Z22932
9.1 Preassembly Boom- And Stick Cylinders To The Boom (Backhoe Attachment) : Z23007; Z23008
10. Mounting Of Boom Z22933
11. Mounting Of Counterweight: Z22934a
12. Mounting The Fuel Tank: Z22935 Or Main Switch Cabinet For Electric Driven Unit
13. Mounting Of Cab Support Z22936
13.1 Mounting Of Cable Transfer Z22937
13.2 Mounting Of Ftont Cover
14. Mounting Of Operator’S Cab Z22938; Z22939
14.1 Mounting Of The Cab Air Cleaner (Cab Support To Cab) Z22940
15. Mounting Of Hydraulic Od Tank Z22941
16. Mounting Of Hydraulic Oil Coolers Z22942; Z22943
17. Mounting Hand Rails, Cat Walks, Steps, Stairs And Ladders: Z22944; Z22945
18. Install The Hydraulic Access Ladder Z22946
19. Installation Of Muffler Assy, And Cover: Z22928
20. Installation Of Air Filters: Z22929 – Z22931
21. Installation Of Lubrication Station And Auxiliary Crane Z22947; Z22948
22. Connection Of Cable Harnesses To The X – Boards
23. Installation Of Hose Connections On Hydr. Tank And Hydr. Oil Coolers: Z22949; Z22950
23.1 Installation Of Hose Connections On Auxiliary Hydraulic Oil Cooler (Z22951 And Z22952)
24. Installation Of Hp- Hoses In Between Hp – Filters And Main Valve Blocks: Z22953
25. Mounting Of Bucket Cylinders : Z22954; Z22955
26. Mounting Of Stick: Z22956
26.1 Mounting Of Stick: Z22989 (Backhoe Attachment)
27. Installation Of Hose Connections To The Boom: Z22957; Z22958
28. Filling Up Hydraulic Tank Z22959
28.1 Filling Up Fuel Tank
29. Pre-Checks For Initial Start-Up
30. Mounting Of Stick Cylinders To The Stick: Z22961
31. Mounting Of The Pin Seals
31.1 Mounting Of The Pin Seals
32. Assembly Of Bullclam Bucket To The Stick (Z21876; Z22962)
32.1 Assembly Of Backhoe To The Stick (Z23005)
33. Assembling And Testing The Fire Detection, Actuation And Suppression System
34. Checks And Adjustments Prior To Commissioning