Expert Support
Full Speed
100% Working
Liebherr Hydraulic Pump DPVG108-280 Repair Manual 10142956
20 USD
- Description
Description
Contents:
1 Symbols and safety instructions
1.1 Symbols in the repair manual
1.2 Safety instructions
2 Technical data
2.1 Type plate
3 Tightening torques
3.1 Standard torques for screw connections
3.2 Torques for standard Vsl screw plugs
3.3 Torques for screw plugs tapered thread
3.4 Torques for screw plugs with o-ring
3.5 Torques for VSTI standard screw plugs
4 Tools
4.1 Customary tools [T=Tool]
4.2 Special tool [LT= Liebherr tool]
4.3 Instructions for the use of tools
5 Sealing work
5.1 Complete seal kit
5.2 Terminal board seal kit
5.3 Sealing the driving shaft
5.4 Sealing the feed pump NG 108 / 165
5.5 Sealing the lid NG 108 / 165 / 250-280
6 RK connecting plate
6.1 Overview
6.2 Removing the pre-assembled terminal board
6.3 Terminal board attachment parts
6.4 Installing the pre-assembled terminalboard
7 RK regulation
7.1 Overview
7.2 Removing the regulation
7.3 Installing the regulation
8 RK driving gear
8.1 Overview
8.2 RK cylinder + control plate + shaft
8.3 RK pull-back ball + pull-back plate
8.4 RK piston with slipper
8.5 RK swivel bearing
8.6 RK lever
8.7 RK swivel yoke
8.8 Removing the driving gear
8.9 Installing the driving gear
9 Regulator types
9.1 Overview
9.2 Sealing the EL-S regulating valve
9.3 Sealing the TCH regulating valve
9.4 Sealing the TCE regulating valve
10 Settings
10.1 General
10.2 EL regulator
10.3 EL-DA regulator
10.4 ELS-DA regulator
10.5 TCE regulator
10.6 TCH regulator













