Expert Support
Full Speed
100% Working
Link-Belt Demolition Tool LDT Safety Operator Manual
15 USD
- Description
Description
Contents:
Preface
Important
Manual Replacement
Registration Form
Possible Variations
Public Notice
Warranty
Safety Statements
Operational Safety
Read Manual Before Operating Or Maintaining The Demolition Tool
Personal Protection
Know Your Equipment
Before Operating
Check The Equipment
Stability
Know The Work Area
Starting Procedure
Place The Load Safely
Safely Operate Equipment
Transporting The Tool
Equipment Condition
Working Overhead
Power Lines
Use Care With Hydraulic Fluid Pressure
Prioritized Oil Flow
Emergency Situations
Unsafe Conditions
Crystalline Silica Dust
Process Material Safely
Lift The Load Safely
Place The Load Safely
Demolition Tool Markings
Transport Rotation Lock
Tool Installation
Installation Procedure
Rotator Installation
Rotation Circuit – Gear Pump Type
Rotation Circuit – Auxiliary Valve On Machine
Hydraulic Start-Up
Start-Up Procedure
General Operation Instructions
Start-Up
Efficient And Productive Operation
Common Operational Concerns
Cutting Larger Materials
Chatter While Cutting
Maintenance Safety
Maintenance Schedule
Four-Hour Checklist
Eight-Hour Checklist
Long-Term Maintenance
Lubrication Points
Tooth And Blade Maintenance
Pulverizing Teeth
Cutting Blades
Blade Removal
Blade Rotation
Blade Gap
Blade Gap Measuring Procedure
Shimming Procedure
General Welding Guidelines
Welding Ground Clamp
Welding Rules
Build-Up And Hard-Surfacing
Hard-Surfacing Patterns
Hard-Surfacing
Notes
Hydraulic/Rotation Maintenance
Hydraulic Requirements
Rotation Valve Settings
Regeneration Valve
Regeneration Valve Adjustment
Regeneration Valve – How It Works
Regeneration Valve
Ldt 250 & 350
Ldt 490
Slewing Ring Maintenance
Rotation Circuit
Rotation With Motion Control Valve
Trouble-Shooting Guide
Warranty And Parts Information











