Expert Support
Full Speed
100% Working
Skyjack Vertical Mast Lifts SJ20 Service Manual 238886ADA 2023
20 USD
- Description
Description
Contents:
Section 1 – Scheduled Maintenance
1.1 Read and Heed
1.2 Maintenance and Inspection Schedule
1.3 Hydraulic System & Component Maintenance and Repair
1.4 About this Section
1.5 Owner’s Annual Inspection Record
1.6 Frequent/Periodic/Annual/Pre-Delivery Inspection Checklist
1.7 Visual and daily maintenance inspections
Section 2 – Maintenance Tables and Diagrams
2.1 Standard Hose Numbering System
2.2 Specifications and Features
2.3 Maximum Platform Capacities (Evenly Distributed)
2.4 Floor Loading Pressure ANSI/CSA
2.5 Torque Specifications
2.6 Torque Specifications for Fasteners (US Imperial)
2.7 Torque Specifications for Fasteners (Metric)
2.8 Torque Specifications for Hydraulic Couplings & Hoses
Section 3 – System Component Identification and Schematics
3.1 Electrical Symbol Chart
3.2 Hydraulic Symbol Chart
3.3 Wire Number and Color Code
3.4 Hydraulic Parts List
3.5 Electrical Parts List
3.6 Hydraulic Connections
3.7 Platform Control Box Wiring
3.8 Platform Control Cable Wiring
3.9 Platform Control Box Wiring – SGLE
3.10 Platform Control Cable Wiring – SGLE
3.11 Beeper
3.12 Base Limit Switch
3.13 Platform Limit Switches
3.14 Motor and Controller Connections
3.15 Mast Cable Harness
3.16 Elevate Telematics Harness
3.17 Battery Management System Harness
3.18 Tilt Switch Harness
3.19 Major Component Identification
3.20 Hydraulic Schematic
3.21 Base Control Wiring
3.22 Main Harness – ZAPI A
3.23 Main Harness Wiring – ZAPI A
3.24 Main Harness – ZAPI B
3.25 Electrical Schematic
Section 4 – Troubleshooting Information
4.1 Introduction
4.2 Electrical System
4.3 Hydraulic System
Section 5 – Procedures
5.1 General
5.2 Platform
5.3 Mast
5.4 Tilt Switch
5.5 Pin Charts
5.6 Display Module
5.7 Batteries
5.8 Battery Charger
5.9 Wheels












