Expert Support
Full Speed
100% Working
Tadano Crane TM-ZR560 Series Operation Manual TM-ZR560-2_OM1-12E 2025
20 USD
- Description
Description
Contents:
A. Safety
1. Safety Rules11
2. Warning Labels38
B. Terminology and Feature
1. Terminology 45
2. How to Read the Performance Data
Table49
3. Safety Device 55
C. Preparation for Operation
1. Before Crane Operation 65
2. Starting the Hydraulic Pump68
3. Setting Up the Outriggers70
4. Taking-out the Hook Block 77
D. Operation
1. Acceleration81
2. Telescoping the Boom 83
3. Hoisting Up and Down the Hook
Block85
4. Elevating the Boom87
5. Swinging the Boom89
E. Preparation for Traveling
1. Stowing the Boom93
2. Retracting the Outriggers97
3. Stopping the Hydraulic Pump 101
4. Checking the Traveling Configuration
102
F. Inspection and Maintenance
1. Precautions for Inspection and
Maintenance 107
2. Inspection and Maintenance 115
3. Pre-operational Inspection 125
4. Greasing130
5. Gear Oil137
6. Hydraulic System140
7. Swing and Winch Systems 146
8. Frame 150
9. Wire Rope 151
G. Action Against Emergency
1. Action Against Emergency 163
H. Information and Data
1. Conversion Tables 169
2. Hand Signals170
3. Major Specifications 173
4. Oils and Greases181












