Expert Support
Full Speed
100% Working
Yanmar Excavator ViO57-6A Service Manual MMB45ENMA00101
80 USD
- Description
Description
Contents:
FOREWORD
1. General Cautions for Maintenance Work
1-1 Correct Work
1-2 Safety Precautions
1-3 Preparations
1-4 Cautions for Disassembly and Reassembly
1-5 Cautions for Removal and Installation of Hydraulic Equipment
1-6 Cautions for Removal and Installation of Hydraulic Piping
1-7 Cautions for Handling Seals
1-8 Correct Installation of Hydraulic Hose
1-9 Specifications of Hydraulic Hose
1-10 Air Release of Hydraulic Equipment2. Technical Data
2-1 Specifications
2-2 Outline Drawing and Working Area
2-3 Weight List of Main Parts
2-4 Lifting Capacity List
2-5 Specifications for Attachment
2-6 Periodic Inspection and Servicing
2-7 Fuel, Lube Oil and Grease Recommended
2-8 Hydraulic Circuit Schematic
2-9 Wiring Diagram3. Service Standards
3-1 Machine Performance
3-2 Engine
3-2-1 Nominal and Allowable Values
3-2-2 Test and Adjustment Specifications
3-3 Undercarriage
3-3-1 Rubber Crawler Specifications
3-3-2 Steel Crawler Specifications
3-3-3 Common Specifications of Steel & Rubber Crawlers
3-4 Controls
3-5 Hydraulic Equipment
3-5-1 Hydraulic Cylinders
3-6 Implement
3-6-1 Front Attachments
3-6-2 Blade Moving Device
3-6-3 Bucket Teeth
3-7 List of Tightening Torque
3-7-1 Machine
3-7-2 Engine
3-7-3 Tightening Torque for General Bolts and Nuts
3-7-4 Hydraulic Fitting
3-8 Pressure Adjustment
3-8-1 Relief Valves
3-8-2 Swing Brake Valve
3-8-3 Cut-Off Valve4. Engine
4-1 Safety
4-1-1 Safety Statements
4-1-2 Safety Precautions
4-2 Engine
4-2-1 Before You Begin Servicing
4-2-2 Introduction
4-2-3 Special Service Tools
4-2-4 Measuring Instruments
4-2-5 Cylinder Head
4-2-6 Measuring and Adjusting Valve Clearance
4-2-7 Crankshaft and Camshaft Components
4-2-8 EGR system
4-3 Fuel System
4-3-1 Before You Begin Servicing
4-3-2 Introduction
4-3-3 Special Service Tools
4-3-4 Measuring Instruments
4-3-5 Fuel System Diagram
4-3-6 Fuel System Components
4-3-7 Fuel Injection Pump
4-3-8 Checking and Adjusting Fuel InjectionTiming
4-3-9 Fuel Injectors
4-4 Cooling System
4-4-1 Before You Begin Servicing
4-4-2 Introduction
4-4-3 Cooling System Diagram
4-4-4 Engine Coolant Pump Components
4-4-5 Engine Coolant System Check
4-4-6 Engine Coolant Pump
4-5 Lubrication System
4-5-1 Before You Begin Servicing
4-5-2 Introduction
4-5-3 Lubrication System Diagram
4-5-4 Checking Engine Oil Pressure
4-5-5 Oil Pump Components
4-6 Turbocharger
4-6-1 Before You Begin Servicing
4-6-2 Introduction
4-6-3 Specifications
4-6-4 Troubleshooting
4-6-5 Turbocharger Components
4-6-6 Turbocharger Component Functions
4-6-7 Washing Procedure
4-6-8 Periodic Inspection
4-7 Starter Motor
4-7-1 Before You Begin Servicing
4-7-2 Introduction
4-7-3 Starter Motor Specifications
4-7-4 Starter Motor Troubleshooting
4-7-5 Starter Motor Components
4-7-6 Starter Motor
4-8 Alternator
4-8-1 Before You Begin Servicing
4-8-2 Introduction
4-8-3 Alternator Specifications
4-8-4 Alternator Troubleshooting
4-8-5 Alternator Components
4-8-6 Alternator Wiring Diagram
4-8-7 Alternator Standard Output
4-8-8 Alternator
4-9 Electronic Control System
4-9-1 Before You Begin Servicing
4-10 Electric Wiring
4-10-1 Electric Wiring Precautions
4-11 Failure Diagnosis.
4-11-1 Special Service Tools
4-11-2 Troubleshooting By Measuring Compression Pressure
4-12 Troubleshooting
4-12-1 Quick Reference Table for Troubleshooting5. Electric System
5-1 Electric Equipment of Machine
5-1-1 Parts Layout of Electrical Equipment
5-1-2 LCD Monitor and Alarm Systems
5-2 Circuit Description of Engine Start and Stop
5-3 Engine ECU (engine controller)
5-3-1 Engine ECU
5-3-2 Circuit Description of Auto Deceleration Mode
5-3-3 Circuit Description of Eco Mode
5-3-4 Control Functions
5-4 Error Code List6. Hydraulic Equipment
6-1 Outline
6-1-1 Control Valve Operation
6-1-2 Additional Operation of Control Valve
6-2 Circuit Operation
6-2-1 Boom
6-2-2 Arm
6-2-3 Bucket
6-2-4 Swing
6-2-5 Boom Swing
6-2-6 Blade
6-2-7 Travel
6-2-8 Non-Deviation Travel (with Boom, Arm orBoom Swing Operation)
6-2-9 Non-Deviation Travel (with Bucket Operation)
6-2-10 Simultaneous Operation of Boom Upand Arm Retract
6-2-11 Simultaneous Operation of Boom Upand Bucket
6-2-12 Simultaneous Operation of Boom Upand Swing
6-2-13 Simultaneous Operation of Arm andBucket
6-2-14 Hydraulic P.T.O.
6-2-15 Travel Alarm
6-2-16 Auto Deceleration
6-3 Hydraulic Pump
6-4 Control Valve
6-5 Pilot Valve
6-6 Swing Motor
6-7 Travel Motor
6-8 Proportional solenoid valve for P.T.O7. Adjustment and Repair
7-1 Engine and Electric Equipment
7-1-1 Removal and Reinstallation of Engine
7-1-2 Removal and Reinstallation of Starter Motor
7-1-3 Removal and Reinstallation of Radiator and Oil Cooler
7-1-4 Removal and Reinstallation of Fan Belt and Compressor Driving Belt
7-1-5 Removal and Reinstallation of Engine ECU
7-2 Undercarriage
7-2-1 Outline
7-2-2 Main Parts
7-2-3 Points of Reassembly (Rubber Track)
7-2-4 Points of Reassembly (Steel Track)
7-2-5 Removal and Reinstallation of Crawler
7-2-6 Removal and Reinstallation of Travel Motor
7-2-7 Disassembly and Reassembly of Idler
7-2-8 Disassembly and Reassembly of Track Roller
7-2-9 Disassembly and Reassembly of Carrier Roller
7-2-10 Installation of Floating Seal
7-2-11 Drawings of Jig
7-3 Controls
7-3-1 Mechanical Control Linkage
7-3-2 Adjustment of Travel Levers
7-3-3 Adjustment of Boom Swing Pedal
7-3-4 Adjustment of Blade Lever
7-3-5 Adjustment of Lock Lever
7-4 Swing Bearing
7-5 Hydraulic Equipment
7-5-1 Removal and Reinstallation of Hydraulic Pump
7-5-2 Removal and Reinstallation of Control Valve
7-5-3 Removal and Reinstallation of Pilot Valves (L and R)
7-5-4 Removal and Reinstallation of Swing Motor
7-5-5 Removal and Reinstallation of Swivel Joint
7-5-6 Disassembly and Reassembly of Swivel Joint
7-5-7 Disassembly and Reassembly of Hydraulic Cylinder
7-5-8 Removal and Reinstallation of Hydraulic Oil Tank
7-5-9 Piping Layout
7-6 Work Implements
7-6-1 Removal and Reinstallation of Work Implements
7-7 Cabin
7-7-1 Removal and Reinstallation of Cabin
7-7-2 Disassembly and Reassembly of Cabin
7-8 Air Conditioner
7-8-1 Removal and Reinstallation of Air Conditioner8. Troubleshooting
8-1 Non-Breakdowns
8-1-1 Natural Release of Bucket
8-1-2 Discontinuous Arm Movement
8-1-3 Drifting of Upperstructure on Quick Travel Operation
8-1-4 Thermal Shock of Travel Motor
8-1-5 Elongation of Boom Swing Cylinder on 68 degrees Swing
8-1-6 Time Lag on Travel Speed Switching
8-1-7 Fluctuation in Oil Level of Hydraulic Oil Tank Due to Temperature Change
8-2 Quick Reference Table for Troubleshooting













