Expert Support
Full Speed
100% Working
Hidromek Backhoe Loader HMK 102B 102S Operation Maintenance Manual EN
20 USD
- Description
Description
List of Files:
Hidromek Backhoe Loader HMK 102B 102S Operation Maintenance Manual Y10_13110.pdf (200 Pages)
Hidromek Backhoe Loader HMK 102B HMK 102S Operation Maintenance Manual Y10_12282.pdf (217 Pages)
Hidromek Backhoe Loader HMK 102B-S Operation Maintenance Manual Y10_12264.pdf (189 Pages)
Hidromek HMK 102B 102S Operation Maintenance Manual Y10_12278.pdf (192 Pages)
Hidromek HMK 102B 102S Operation Maintenance Manual Y10_13102.pdf (208 Pages):
1.1. FOREWORD
1.2. CE MARKING AND EMC DIRECTIVE
1.3. IDENTIFICATION PLATE
1.4. BACKHOE LOADER
1.5. SAFETY NOTICES
1.6. OTHER NOTICES
1.7. ENVIRONMENTAL STANDARDS
1.8. WARNING SYMBOLS
1.9. COPYRIGHT
1.10. SPARE PARTS AND SERVICE
2.1. GENERAL SAFETY INFORMATION
2.2. SAFETY PRECAUTIONS
2.3. PRE-START SAFETY
2.4. SAFETY DURING OPERATION
2.5. INSPECTION & MAINTENANCE SAFETY
2.6. BATTERY SAFETY
2.7. WARNING LABELS & DECALS
2.8. PROHIBITED MACHINE OPERATION
2.9. END OF WORKSHIFT MAINTENANCE & INSPECTION
3.1. FRONT INSTRUMENT PANEL
3.2. RIGHT HAND SIDE INSTRUMENT PANEL
3.3. LEFT HAND SIDE CONSOLE
3.4. OPERATOR’S SEAT
3.5. TOOLBOX
3.6. BACKHOE CONTROL CONSOLE
3.7. REAR WINDOW AND REAR WINDOW WIPER
3.8. INTERIOR LIGHT
3.9. COAT HANGER
3.10. BACKHOE JOYSTICKS (OPTIONAL)
3.11. AIR CONDITION CONTROL PANEL (OPTIONAL)
3.12. AUXILIARY VALVE PEDAL
4.1. GENERAL
4.2. BEFORE STARTING THE ENGINE
4.3. STARTING THE ENGINE
4.4. DRIVING THE MACHINE
4.5. JUMP STARTING THE ENGINE
4.6. BASIC PRECAUTIONS FOR OPERATION IN COLD AND HOT CLIMATE
4.7. PREPARATIONS FOR TRAVEL
4.8. STOPPING and PARKING THE MACHINE
4.9. UNINTENTIONAL SHUT DOWN DURING TRAVEL
4.10. STEERING IN CASE OF EMERGENCY
4.11. FIELD TEST OF THE EMERGENCY STEERING
4.12. ENGAGING ATTACHMENT SAFETY LOCKS
4.13. CONTROLLING HYDRAULIC CLAMP CYLINDERS
4.14. SIDESHIFTING THE BACKHOE
4.15. TELESCOPIC DIPPER (OPTIONAL)
4.16. FOUR WHEEL STEERING SYSTEM (HMK 102S MODEL)
4.17. BRAKING
4.18. THE LOADER OPERATION
4.19. THE BACKHOE OPERATION
4.20. REPLACING ATTACHMENTS
4.21. TRANSPORTING THE MACHINE
4.22. TOWING PROCEDURE FOR A DISABLED MACHINE
4.23. LIFTING BY A CRANE
4.24. PRESERVING THE MACHINE FOR STORAGE
5.1. GENERAL INFORMATION
5.2. GENERAL SAFETY
5.3. INSPECTION & MAINTENANCE CHART
5.4. ENGINE DESCRIPTION
5.5. PERIODIC MAINTENANCE
5.6. TABLE of LUBRICANTS & FLUIDS
5.7. PRE-START (EVERY 8 HOURS) INSPECTION & MAINTENANCE
5.8. WEEKLY (EVERY 50 HOURS) INSPECTION & MAINTENANCE
5.9. EVERY 100 HOURS INSPECTION & MAINTENANCE
5.10. EVERY 250 HOURS INSPECTION & MAINTENANCE
5.11. EVERY 500 HOURS INSPECTION & MAINTENANCE
5.12. EVERY 1000 HOURS INSPECTION & MAINTENANCE
5.13. 2000 HOURS MAINTENANCE
5.14. MISCELLANEOUS
6.1. TECHNICAL SPECIFICATIONS OF HMK 102B
6.2. TECHNICAL SPECIFICATIONS OF HMK 102S
6.3. LIFTING REGULATIONS AND SAFE WORKING LOADS (SWL)
6.4. SOUND and VIBRATION
7.1. GENERAL
7.2. TILTING FORKS
7.3. HYDRAULIC BREAKER
7.4. HYDRAULIC AUGER
7.5. LOG GRAB
7.6. GRADING BLADE
7.7. AIR COMPRESSOR
7.8. FORKLIFT ATTACHMENT & CLAMSHELL BUCKET
7.9. TRAPEZOID DITCH BUCKET
7.10. RIPPER
7.11. SIDE SHIFT BUCKET
7.12. CLAMSHELL GRAB
7.13. WINCH
7.14. STREET SWEEPER
7.15. QUICK COUPLER
8.1. HAND SIGNALS
8.2. TABLE OF TORQUE VALUES FOR FASTENERS
8.3. CONTACTS
8.4. NOTES











