Expert Support
Full Speed
100% Working
Skyjack Vertical Mast Lifts SJ12 SJ16 Operators Manual 157980AB-A 2012
10 USD
- Description
Description
Contents:
Section 1 – About Your Aerial Platform
Reed and Heed
Safety Rules
Section 2 – Familiarization
2.1 Familiarization of SJ12/16 Series
2.2 Component Identification
2.3 Visual & Daily Maintenance Inspections
2.4 Function Tests
2.5 Winching and Towing Procedures
2.6 Emergency Lowering Procedure
Section 3 – Operation
3.1 General
3.2 Major Components
3.3 Major Assemblies
3.4 Serial Number Nameplate
3.5 Component Identification
3.6 Component Identification (Optional Equipment/Attachments)
3.7 Operator’s Responsibility
3.8 Start Operation
3.9 Loading/Unloading
3.10 Platform Traversing
3.11 Accessing the Hydraulic/Electrical Compartment
3.12 Battery Maintenance
Section 4 – Tables
Table 4.1 Standard and Optional Features
Table 4.2 Owner’s Annual Inspection Record
Table 4.3 Specifications and Features
Table 4.4 Maximum Platform Capacities (Evenly Distributed)
Table 4.5 Floor Loading Pressure
Table 4.6 Maintenance and Inspection Schedule
Table 4.7 Operator’s Checklist
Section 5 – Labels












