Expert Support
Full Speed
100% Working
Tadano Work Platform AT-300CG-2 Operation Manual AT-300CG-2_OM4-11E 2019
20 USD
- Description
Description
Contents:
Introduction
Warranty
Maintenance and Inspection
In Event of Failure
For Safety
Contents
Name of Each Part
Contents with Illustration
Upper Controls
Lower Controls
Outrigger Controls
Safety Precautions
Precautions Before Operation
Precautions during Operation
Precautions after Operation
Precautions before Traveling
Precautions during Traveling
Warning Labels
Label Location and Content of Warnings
OPERATION
Terminology
Outline of Operation Procedures at
Elevated Positions
Preparatory Steps
During Work
At End of Work
How to Read Working Range Chart
Outrigger Extension and Working Range
AMC (Automatic Moment and Motion
Controller)
Configuration and Functions of AMC
System
Controls
Interference Prevention Function
AMC Preoperational Inspection
Recovery Operation at Automatic Stop
When AMC Indication Is As Follows
Other Safety Devices
Foot switch
Jack Interlock
Boom Interlock
Shift Lever Interlock
Parking Brake Alarm
PTO Switch-off Reminder Alarm
Setting Up Vehicle
Selecting Location and Setting Up
PTO Operation and Warm-up
PTO Operation
Warm-up Operation in Cold season
Outrigger Operation
Controls
Setting-up Outriggers
Precautions about Setting-up on Slope
Extending Outriggers
Procedure for Level Set-up
Stowing Outriggers
Engine Start and Stop Operations
Starting and Stopping Engine
Lower Controls (Standard Specification)
Emergency Stop Operation
Emergency Stop Cancel Operation
Accelerator Operation
Boom Operation
Automatic Preparation and Stowing of
Basket and Boom
Lower Controls (Joystick Specification)
Emergency Stop Operation
Emergency Stop Cancel Operation
Accelerator Operation
Boom Operation
Basket Vertical/Horizontal Movement
Basket Swing Operation
Automatic Preparation and Stowing of
Basket and Boom
Upper Controls
Precautions before Entering Basket
Precautions When Working in Basket
Emergency Stop Operation
Emergency Stop Cancel Operation
Engine Start and Stop Operations
Accelerator Operation
Boom Operation
Basket Vertical/Horizontal Movement
Swinging Basket
Basket Leveling Adjustment
Canceling Interference Prevention
Function
Automatic Preparation and Stowing of
Basket and Boom
How to Use Other Accessories
Hour Meter
Work Lamp (Option)
Marker Lamp (Option)
Checking Traveling Configuration
INSPECTION AND
MAINTENANCE
Precautions for Inspection and
Maintenance
Precautions for Inspection and
Maintenance
Inspection and Maintenance
Regarding Inspection and Maintenance
Under Severe Use (Severe Condition)
Conditions of Severe Use
Periodic Replacement Parts
Items to be Inspected Regularly
Maintenance after Operation under
Severe Conditions
Preoperational Inspection
Inspection of Vehicle Appearance, Labels
and Hydraulic Oil Level
Inspection of PTO and Outriggers
Inspection of AMC and Lower Controls
Inspection of the Basket and Upper
Controls
Inspection of Jack Retraction
Greasing
Maintenance Table
Greasing Chart
Gear Oil
Maintenance Table
Swing Speed Reducer
Hydraulic System
Maintenance Table
Hydraulic Oil Tank
Air Breather
Return Filter
Line Filter
Swing System
Maintenance Table
Swing Bearing Mounting Bolt
Electrical System
Maintenance Table
Replacing Fuses
Action against Emergency
When worker cannot get off or boom
cannot be retracted
When Failure Occurs in Vehicle Engine
When You Cannot Retract Outriggers
If Basket Inclines beyond Range where
Ordinary Level Adjustment is Effective
Troubleshooting
INFORMATION AND DATA
Conversion Tables
Major Specifications
Oils and Greases
Oils and Greases Table
Recommended Oils and Greases













