Expert Support
Full Speed
100% Working
Skyjack Vertical Mast Lifts SJ12 SJ16 Operators Manual 213721AEA 2022
10 USD
- Description
Description
Contents:
Section 1 – About this Mobile Elevating Work Platform (MEWP)
1.1 Read and heed
1.2 Primary assemblies
1.3 Serial number nameplate
1.4 Maintenance responsibility
Section 2 – General Safety Precautions
2.1 Electrocution hazards
2.2 Safety instructions
2.3 Fall-protection
2.4 Worksite inspection
Section 3 – Familiarization
3.1 Overview of the MEWP
3.2 Manual storage box
3.3 Control functions
3.4 Features and devices
3.5 General components
3.6 Optional equipment
Section 4 – Inspections Before Operation
4.1 Operator’s Responsibility
4.2 Visual and daily maintenance inspections
4.3 Function tests
4.4 Operator’s Checklist
Section 5 – Operation
5.1 Energize the base control console
5.2 Raise or lower the platform with the base control console
5.3 Energize the platform control console
5.4 Raise or lower the platform with the platform control console
5.5 Drive forward or rearward
5.6 Steer
5.7 Platform Traversing
5.8 Raise and lower with the SGLE platform control console (optional equipment)
5.9 MEWP shutdown
Section 6 – Additional Procedures
6.1 Use the emergency-lowering function
6.2 Release the brakes manually
6.3 Winch and tow the MEWP
6.4 Move the MEWP for transport
6.5 Open the hydraulic/electrical compartment
6.6 Charge the Battery
Section 7 – Specifications
7.1 Standard and optional equipment
7.2 Owner’s annual inspection record
7.3 Specifications
7.4 Environment
7.5 Maximum platform capacities (evenly distributed)
7.6 Floor Loading Capacity
Section 8 – Labels
8.1 SJ12 and SJ16 models
Section 9 – Unique Skyjack Features












