Expert Support
Full Speed
100% Working
Skyjack Vertical Mast Lifts SJ12E SJ16E SJ20E Service Manual 241914ADA 2023
20 USD
- Description
Description
Contents:
Section 1 – Maintenance
1.1 Read and Heed
1.2 General information
1.3 Scheduled maintenance and inspections
Section 2 – Maintenance Tables and Diagrams
2.1 Standard Hose Numbering System
2.2 Torque Specifications for Fasteners (Metric)
2.3 Torque Specifications for Fasteners (US Imperial)
2.4 Torque Specifications for Hydraulic Couplings & Hoses
2.5 MEWP Torque Specifications
2.6 MEWP Specifications – S/N A601 001 639 & above
2.7 MEWP Specifications – S/N A601 001 638 and below
2.8 Maximum platform capacities (evenly distributed)
Section 3 – System Component Identification and Schematics
3.1 Electrical Symbol Chart
3.2 Hydraulic Symbol Chart
3.3 Wire Number and Color Code
3.4 Hydraulic Parts List
3.5 Electrical Parts List
3.6 Hydraulic Connections
3.7 Platform Control Box Wiring
3.8 Platform Control Cable Wiring
3.9 Platform Control Box Wiring – SGLE
3.10 Platform Control Cable Wiring – SGLE
3.11 Beeper
3.12 Base Limit Switch
3.13 Platform Limit Switches
3.14 Motor and Controller Connections
3.15 Mast Cable
3.16 Battery Management System Harness
3.17 Major Component Identification
3.18 Hydraulic Schematic
3.19 Base Control Wiring
3.20 Main Harness – ZAPI A
3.21 Main Harness Wiring – ZAPI A
3.22 Main Harness – ZAPI B
3.23 Elevate Telematics Harness
3.24 Electrical Schematic
Section 4 – Troubleshooting Information
4.1 Introduction
4.2 Electrical System
4.3 Hydraulic System
Section 5 – Procedures
5.1 Safety and Workmanship
5.2 Platform
5.3 Mast
5.4 Hydraulic System
5.5 Tilt Switch
5.6 ZAPI Motor Controller
5.7 Skycoded Display Module
5.8 Batteries
5.9 Battery Charger
5.10 Wheels












